Vai al contenuto principale
avoidance Peru Documentazione completa General Methodology v2.0

Cup of The Amazon – Alto Mayo

CE-alto-mayo-protected-

6.6 / 10
Integrity
6.6
Transparency
6.8
Claim Safety
6.0
Documentation
7.4

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB and no material findings or corrective actions were reported in the monitoring/verification documentation.

missing Project-specific baseline with baseline reassessment timing not stated in the extracted record; leakage is treated as 0% despite being described as quantified.

Transparency

verified Claimed and verified emission reductions match (1,364,191), and the monitoring period is clearly stated (2014-06-15 to 2016-06-14) in the monitoring report (2016).

missing Key risk parameters are not fully evidenced in the extracted record (e.g., baseline reassessment date; CORSIA/CCP status not stated).

Claim Safety

verified Buffer pool contribution of 10% and no reversals reported reduces permanence-related claim risk for an avoidance ARR project.

missing CORSIA eligibility and CCP status are not stated in the extracted record, and the project-specific baseline plus 0% leakage deduction increases perceived over-crediting/marketing risk.

Documentation

verified Multiple core documents are present (PDD, monitoring report, validation report) with high extraction confidence and an identified VVB (AENOR).

missing Some important fields are missing or not evidenced in the extracted record (e.g., baseline reassessment timing; detailed reversal discussion in earlier validation materials).

Detailed Analysis

Integrity

The monitoring/verification record shows additionality was confirmed by the VVB (AENOR) using a combined test, and the monitoring report (2016) reports no material findings and no corrective actions. Permanence risk management is partly addressed via a 10% buffer contribution and no reversals reported. Integrity is reduced by reliance on a project-specific baseline (VM0015) with baseline reassessment timing not stated in the extracted record, and by leakage being described as quantified while still resulting in a 0% deduction in the monitoring report (2016).

Transparency

The monitoring report (2016) clearly states the monitoring period (2014-06-15 to 2016-06-14) and reports verified ERs equal to claimed ERs (1,364,191), which supports MRV consistency. The VVB is identified as AENOR, and the project is on the VCS registry. Transparency is limited by missing extracted details on baseline reassessment timing and by eligibility/status fields (e.g., CORSIA, CCP) not being stated in the extracted record.

Claim Safety

Because this is an avoidance ARR project with a buffer contribution (10%) and no reversals reported, permanence-related claim risk is moderated. However, the baseline is project-specific and the extracted record does not state when (or whether) the baseline was reassessed during the long crediting period (2008–2028), which can elevate over-crediting risk. In addition, leakage is treated as 0% despite being described as quantified in the monitoring report (2016), and CORSIA eligibility/CCP status are not stated in the extracted record, increasing uncertainty for downstream claims.

Documentation

The extracted record indicates a solid document set (PDD, monitoring report, validation report) and a relatively recent monitoring report date (2016-08-12), with high extraction confidence and no reported corrective actions. Documentation quality is weakened by missing extracted specifics for some key risk controls (notably baseline reassessment timing and detailed reversal treatment in earlier validation materials). Overall, the documentation is adequate but not fully complete on the highest-risk parameters for credit quality assessment.

Overall

Overall scoring reflects a generally well-documented VCS project with VVB-confirmed additionality, matched claimed vs verified ERs, and a buffer contribution supporting permanence. The main quality uncertainties are baseline robustness over time (reassessment timing not stated) and the plausibility of a 0% leakage deduction despite leakage being described as quantified. Contradiction addressed: reversal events are listed as “not addressed” in an older validation report (2012-07-30) but “none reported” in a later validation report (2016-09-09); the later document is privileged as more recent, but the inconsistency indicates reporting reliability issues and slightly lowers integrity/transparency.

Audit Analysis

This is a VCS ARR avoidance project using a project-specific baseline and a 10% buffer contribution, with additionality confirmed by the VVB and no material findings reported. However, leakage is reported as quantified yet results in a 0% deduction, and baseline reassessment timing is not stated in the extracted record, which increases over-crediting risk for claims.

Project Description

Why we chose this project: “During our site visit in 2016, the impact of reforestation efforts of the project area compared to the surrounding areas was visible and a testament to Alto Mayo’s success. This success extends beyond the reforestation efforts; Alto Mayo instills sustainable and participatory farming techniques in coffee plantations, offers training

Red Flags

  • Leakage is described as quantified but the leakage deduction is 0%, which can indicate optimistic assumptions if not clearly substantiated in the monitoring documentation.
  • Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record, raising uncertainty about baseline validity over time.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide clear evidence of baseline reassessment (date, rationale, and any parameter updates) during the crediting period, ideally in a verification/monitoring report annex.
  • Publish or extract a transparent leakage quantification summary showing activity data, assumptions, and why the resulting leakage deduction is 0%.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined additionality test

Permanence

10% buffer; no reversals reported

Leakage

0% deduction despite quantified leakage claim

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated in extracted record

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti