Deployment of Electric Buses in Kenya

GS-4091 ↗ · current registry ID: GS12146

#137of 202 in Industrial#29of 42 in Kenya#327of 426 in Gold Standard (GS)

4.7/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
3.5
Documentation
5.0

Audit Analysis

This Gold Standard electric-bus project in Kenya has VVB-confirmed additionality and documented safeguards, but is undermined by nine cross-document contradictions, a severe discrepancy between the lifetime credit estimate (106,313 tCO₂e) and the single monitoring-period verification (642 tCO₂e), an inconsistent leakage justification, and a project-specific baseline with no recorded reassessment. The verification report also carries seven material findings and corrective actions, most relating to documentation completeness rather than methodology, but the cumulative effect is a project whose credit claims rest on a fragile evidentiary base.

Red Flags

  • Verified emissions reductions of 642 tCO₂e in the monitoring period represent only ~1.2% of the pro-rata expectation (~53,157 tCO₂e) derived from the 106,313 tCO₂e lifetime estimate over the 5-year crediting period, raising serious questions about either project performance or data integrity.
  • The monitoring report carrying the 642 tCO₂e figure is dated 2020-10-14, which predates the crediting period start of 2022-04-29, creating a fundamental timeline inconsistency that undermines confidence in the MRV chain.
  • Energy source is recorded as 'renewable' in the 2020 monitoring report but 'grid' in the 2024 monitoring report; the credit calculation basis (displacement of diesel vs. renewable charging) is therefore ambiguous.
  • Leakage deduction is 0% with the justification described as 'not addressed' in the verification report, while the PDD states it was 'deemed negligible' — the two documents are inconsistent on a material credit parameter.
  • The verification report (2026-03-06) lists seven material findings and corrective actions, including an outdated PoA-DD template, incomplete KPI table, and missing VPA eligibility criteria, indicating the project documentation did not fully meet Gold Standard requirements at verification.

Credit Vintages

IssuedRetiredAvailable
2022
21021
2023
2360236
2024
3850385
Total6420642

Risk Indicators

Additionality

VVB-confirmed (combined/investment test)

Permanence

Not addressed in verification report; no buffer pool stated

Leakage

0% deduction; justification inconsistent across documents

Baseline

Project-specific; no reassessment date recorded

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.S

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents