- Project
- 119.8 MW Natural Gas Based Combined Cycle Power Plant, At Tanjavur, Tamilnadu By M/S Aban Power Company Limited (VCS-68)
- Document type
- Validation Report
- Registry
- Verra
- Retrieved from the registry
- File
- VCS-Verification Representation Deed_VCS.VER.21.34_VCS068.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 5.8/10Re-assessment pending
See CarbonMeld's analysis of this project →