VCS-Verification Representation Deed_VCS.VER.21.34_VCS068

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
119.8 MW Natural Gas Based Combined Cycle Power Plant, At Tanjavur, Tamilnadu By M/S Aban Power Company Limited (VCS-68)
Document type
Validation Report
Registry
Verra
Retrieved from the registry
File
VCS-Verification Representation Deed_VCS.VER.21.34_VCS068.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 5.8/10Re-assessment pending

See CarbonMeld's analysis of this project →