Registry document
VCS_MR_68_20.09.2021_final
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 119.8 MW Natural Gas Based Combined Cycle Power Plant, At Tanjavur, Tamilnadu By M/S Aban Power Company Limited (VCS-68)
- Document type
- Monitoring Report
- Registry
- Verra
- Retrieved from the registry
- File
- VCS_MR_68_20.09.2021_final.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 6.3/10Scored
See CarbonMeld's analysis of this project →