Registry document
(1)Verification Report_1st monitoring period_20-09-2016 to 31-03-2018_v1.0
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 30 MW Solar PV Project by Nirosha Solar Power Private Limited (GS-1375)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- (1)Verification Report_1st monitoring period_20-09-2016 to 31-03-2018_v1.0.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 5.6/10Re-assessment pending
See CarbonMeld's analysis of this project →