Registry document
Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) (GS-1371)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02 (Monitoring Report), 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) (GS-1371). CarbonMeld copy, retrieved from the registry on 10 Apr 2026: https://carbonmeld.com/projects/docs/70-mw-bhadla-solar-power-plant-by-fortum-finnsurya-energy-pv-2fd71c/6ec90cb78da31171/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.