Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) (GS-1371)
Document type
Monitoring Report
Registry
Gold Standard
Retrieved from the registry
File
Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf

Open the PDFRegistry record of the project ↗

AnalysisRe-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Gold Standard. Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02 (Monitoring Report), 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) (GS-1371). CarbonMeld copy, retrieved from the registry on 10 Apr 2026: https://carbonmeld.com/projects/docs/70-mw-bhadla-solar-power-plant-by-fortum-finnsurya-energy-pv-2fd71c/6ec90cb78da31171/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.