Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02

Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL 16-01) (GS-1371)
Document type
Monitoring Report
Registry
Gold Standard
Retrieved from the registry
File
Monitoring Report_1st monitoring period_06-11-2017 to 01-04-2019_v02.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 5.8/10Re-assessment pending

See CarbonMeld's analysis of this project →