Registry document
Guanting phase II Gap PDD
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Beijing Guanting Wind Power Project Phase II And Phase II Addition (VCS-830)
- Document type
- Project Design Document
- Registry
- Verra
- Retrieved from the registry
- File
- Guanting phase II Gap PDD.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Rated
See CarbonMeld's analysis of this project →Cite this document
Verra. Guanting phase II Gap PDD (Project Design Document), Beijing Guanting Wind Power Project Phase II And Phase II Addition (VCS-830). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/beijing-guanting-wind-power-project-phase-ii-and-phase-ii-ad-0e8063/a8b9b59d864156f1/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
