Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

Guanting phase II Gap PDD

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Beijing Guanting Wind Power Project Phase II And Phase II Addition (VCS-830)
Document type
Project Design Document
Registry
Verra
Retrieved from the registry
File
Guanting phase II Gap PDD.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.5/10Rated

See CarbonMeld's analysis of this project →

Cite this document

Verra. Guanting phase II Gap PDD (Project Design Document), Beijing Guanting Wind Power Project Phase II And Phase II Addition (VCS-830). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/beijing-guanting-wind-power-project-phase-ii-and-phase-ii-ad-0e8063/a8b9b59d864156f1/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.