Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

VCS 1182-Validation-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Project-clean (1)

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Cgn Inner Mongolia Zhurihe Phase I Wind Farm Project (VCS-1182)
Document type
Validation Report
Registry
Verra
Retrieved from the registry
File
VCS 1182-Validation-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Project-clean (1).pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 2.9/10Rated

See CarbonMeld's analysis of this project →

Cite this document

Verra. VCS 1182-Validation-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Project-clean (1) (Validation Report), Cgn Inner Mongolia Zhurihe Phase I Wind Farm Project (VCS-1182). CarbonMeld copy, retrieved from the registry on 7 Sep 2026: https://carbonmeld.com/projects/docs/cgn-inner-mongolia-zhurihe-phase-i-wind-farm-project-d3a965/066f8ce31f5bb068/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.