Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN

Registry document

VCS 1182-Validation-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Project-clean (1)

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Cgn Inner Mongolia Zhurihe Phase I Wind Farm Project (VCS-1182)
Document type
Validation Report
Registry
Verra
Retrieved from the registry
File
VCS 1182-Validation-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Project-clean (1).pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 6.0/10Re-assessment pending

See CarbonMeld's analysis of this project →