Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

VCS-Monitoring-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Proje...

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Cgn Inner Mongolia Zhurihe Phase I Wind Farm Project (VCS-1182)
Document type
Monitoring Report
Registry
Verra
Retrieved from the registry
File
VCS-Monitoring-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Proje....pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 2.9/10Rated

See CarbonMeld's analysis of this project →

Cite this document

Verra. VCS-Monitoring-Report-CGN Inner Mongolia Zhurihe Phase I Wind Farm Proje... (Monitoring Report), Cgn Inner Mongolia Zhurihe Phase I Wind Farm Project (VCS-1182). CarbonMeld copy, retrieved from the registry on 7 Sep 2026: https://carbonmeld.com/projects/docs/cgn-inner-mongolia-zhurihe-phase-i-wind-farm-project-d3a965/46ca5c1bc76e39cb/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.