Registry document
Verification Report_2nd monitoring period_01.12.2018 to 30.11.2019
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- GS1247 VPA 126 Zoba Anseba Community Safe Water (GS-1457)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Verification Report_2nd monitoring period_01.12.2018 to 30.11.2019.pdf
Open the PDFRegistry record of the project ↗
AnalysisNo public grade applies yet
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Verification Report_2nd monitoring period_01.12.2018 to 30.11.2019 (Verification Report), GS1247 VPA 126 Zoba Anseba Community Safe Water (GS-1457). CarbonMeld copy, retrieved from the registry on 19 Apr 2026: https://carbonmeld.com/projects/docs/gs1247-vpa-126-zoba-anseba-community-safe-water-1b826b/b6bdd3afb4fb1617/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
