Registry document
Verification Report_1st monitoring period_11.12.2018 to 31.12.2019
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- GS1366 VPA 9 Kilifi Borehole Rehabilitation Project (GS-1410)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Verification Report_1st monitoring period_11.12.2018 to 31.12.2019.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 5.9/10Re-assessment pending
See CarbonMeld's analysis of this project →