Registry document
11-Wenjiaba_VCS FVeR_20210826-20220525
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Guizhou Wenjiaba CMM Power Generation Project (VCS-2383)
- Document type
- Verification Report
- Registry
- Verra
- Retrieved from the registry
- File
- 11-Wenjiaba_VCS FVeR_20210826-20220525.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 5.8/10Re-assessment pending
See CarbonMeld's analysis of this project →