Registry document
CDM_PROJ_DESC_PL1304_08MAR2012
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Guohua Rongcheng Phase III Wind Farm Project (VCS-1304)
- Document type
- Project Design Document
- Registry
- Verra
- Retrieved from the registry
- File
- CDM_PROJ_DESC_PL1304_08MAR2012.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Verra. CDM_PROJ_DESC_PL1304_08MAR2012 (Project Design Document), Guohua Rongcheng Phase III Wind Farm Project (VCS-1304). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/guohua-rongcheng-phase-iii-wind-farm-project-126a64/508b3da94fdb77f3/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
