Registry document

A+SH_SYST_07922 VcsVerificationReport

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Hebei Chongli County Qingsanying Second Phase 49.3MW Wind Power Project (VCS-807)
Document type
Verification Report
Registry
Verra
Retrieved from the registry
File
A+SH_SYST_07922 VcsVerificationReport.pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.2/10Rated

See CarbonMeld's analysis of this project →

Cite this document

Verra. A+SH_SYST_07922 VcsVerificationReport (Verification Report), Hebei Chongli County Qingsanying Second Phase 49.3MW Wind Power Project (VCS-807). CarbonMeld copy, retrieved from the registry on 7 Sep 2026: https://carbonmeld.com/projects/docs/hebei-chongli-county-qingsanying-second-phase-49-3mw-wind-po-574e90/9388da5615f869ec/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.