Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN

Registry document

A+SH_SYST_07922 VcsVerificationReport

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Hebei Chongli County Qingsanying Second Phase 49.3MW Wind Power Project (VCS-807)
Document type
Verification Report
Registry
Verra
Retrieved from the registry
File
A+SH_SYST_07922 VcsVerificationReport.pdf

Open the PDFRegistry record of the project ↗

AnalysisScore 6.7/10Scored

See CarbonMeld's analysis of this project →