Registry document
Monitoring Report_7th monitoring period_01.01.2018 to 31.12.2018_v2
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Hunan Guanbaodu-Liangjiangkou Small-scale Hydropower Bundle Project (GS-1216)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_7th monitoring period_01.01.2018 to 31.12.2018_v2.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Monitoring Report_7th monitoring period_01.01.2018 to 31.12.2018_v2 (Monitoring Report), Hunan Guanbaodu-Liangjiangkou Small-scale Hydropower Bundle Project (GS-1216). CarbonMeld copy, retrieved from the registry on 15 Apr 2026: https://carbonmeld.com/projects/docs/hunan-guanbaodu-liangjiangkou-small-scale-hydropower-bundle--b08010/0e7d1627cb86f369/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
