Registry document
Verification Report_6th monitoring period_01.01.2016 to 31.12.2017_v1
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Hunan Guanbaodu-Liangjiangkou Small-scale Hydropower Bundle Project (GS-1216)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Verification Report_6th monitoring period_01.01.2016 to 31.12.2017_v1.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.5/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Verification Report_6th monitoring period_01.01.2016 to 31.12.2017_v1 (Verification Report), Hunan Guanbaodu-Liangjiangkou Small-scale Hydropower Bundle Project (GS-1216). CarbonMeld copy, retrieved from the registry on 15 Apr 2026: https://carbonmeld.com/projects/docs/hunan-guanbaodu-liangjiangkou-small-scale-hydropower-bundle--b08010/9a79d2eb55b634dd/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
