Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Registry document

VCS-Validation-Report-Kumkoy HEPP_21XT45MD_Rev 3.0Aa_31012023 (1)

Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.

Project
Kumköy Hydroelectric Power Plant, Samsun (VCS-986)
Document type
Validation Report
Registry
Verra
Retrieved from the registry
File
VCS-Validation-Report-Kumkoy HEPP_21XT45MD_Rev 3.0Aa_31012023 (1).pdf

Open the PDFRegistry record of the project ↗

AnalysisDocument-based rating 3.6/10Re-assessment pending

See CarbonMeld's analysis of this project →

Cite this document

Verra. VCS-Validation-Report-Kumkoy HEPP_21XT45MD_Rev 3.0Aa_31012023 (1) (Validation Report), Kumköy Hydroelectric Power Plant, Samsun (VCS-986). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/kumk-y-hydroelectric-power-plant-samsun-65c103/8c87fb1a139682b0/.

Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.