Registry document
VCS Ver Larimar 01012021-31122022_Final_signed
Published by Verra for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Larimar Wind Farm Project (VCS-1644)
- Document type
- Validation Report
- Registry
- Verra
- Retrieved from the registry
- File
- VCS Ver Larimar 01012021-31122022_Final_signed.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.8/10Re-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Verra. VCS Ver Larimar 01012021-31122022_Final_signed (Validation Report), Larimar Wind Farm Project (VCS-1644). CarbonMeld copy, retrieved from the registry on 3 Sep 2026: https://carbonmeld.com/projects/docs/larimar-wind-farm-project-8181c5/944da2022b2dd1ad/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
