Registry document
(1)Verification Report_1st monitoring period_15.05.19 to 30.06.20
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Mozambique Safe Water Project (GS-1412)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- (1)Verification Report_1st monitoring period_15.05.19 to 30.06.20.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 5.4/10Re-assessment pending
See CarbonMeld's analysis of this project →