Registry document
Monitoring Report_5th monitoring period_01.01.2018 to 30.11.2018_v1
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Nanyang Danjiang River Solar Cooker Project Phase I (GS-1611)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Monitoring Report_5th monitoring period_01.01.2018 to 30.11.2018_v1.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Monitoring Report_5th monitoring period_01.01.2018 to 30.11.2018_v1 (Monitoring Report), Nanyang Danjiang River Solar Cooker Project Phase I (GS-1611). CarbonMeld copy, retrieved from the registry on 17 Apr 2026: https://carbonmeld.com/projects/docs/nanyang-danjiang-river-solar-cooker-project-phase-i-64cddb/4ea84273dbffd30a/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
