Registry document
Verification Report_1st monitoring period_05-04-2010 to 25-03-2013
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Qielong 1.2MW Hydro Power Project (GS-846)
- Document type
- Verification Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Verification Report_1st monitoring period_05-04-2010 to 25-03-2013.pdf
Open the PDFRegistry record of the project ↗
AnalysisDocument-based rating 3.3/10Rated
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. Verification Report_1st monitoring period_05-04-2010 to 25-03-2013 (Verification Report), Qielong 1.2MW Hydro Power Project (GS-846). CarbonMeld copy, retrieved from the registry on 5 Oct 2026: https://carbonmeld.com/projects/docs/qielong-1-2mw-hydro-power-project-a7797b/6f3cc8944d32b5b7/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
