Registry document
231218_GS_Annual_Monitoring_Report
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Sapphire 49.5 MW Wind Farm Project (GS-3328)
- Document type
- Monitoring Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- 231218_GS_Annual_Monitoring_Report.pdf
Open the PDFRegistry record of the project ↗
AnalysisRe-assessment pending
See CarbonMeld's analysis of this project →Cite this document
Gold Standard. 231218_GS_Annual_Monitoring_Report (Monitoring Report), Sapphire 49.5 MW Wind Farm Project (GS-3328). CarbonMeld copy, retrieved from the registry on 20 Apr 2026: https://carbonmeld.com/projects/docs/sapphire-49-5-mw-wind-farm-project-21c04f/2ec76ecc940925eb/.
Please cite or link this page rather than the PDF file: it shows where the document comes from and links to the project's page.
