Registry document
Updated 20220905_GS-FVerR-Sapphire Wind 1st_V02-clean
Published by Gold Standard for this project. CarbonMeld stores a copy as retrieved from the registry: the document is the registry's, not ours.
- Project
- Sapphire 49.5 MW Wind Farm Project (GS-3328)
- Document type
- Validation Report
- Registry
- Gold Standard
- Retrieved from the registry
- File
- Updated 20220905_GS-FVerR-Sapphire Wind 1st_V02-clean.pdf
Open the PDFRegistry record of the project ↗
AnalysisScore 6.0/10Re-assessment pending
See CarbonMeld's analysis of this project →