Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

Feistner Farms

TC-2030 ↗

4.4 / 10
Integrity
5.2
Transparency
3.4
Claim Safety
4.1
Documentation
4.6

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB in the verification report dated 2025-05-16.

missing Baseline method, leakage deduction, and buffer pool treatment are not stated in the available documents.

Transparency

verified The monitoring period is clearly stated as 2024-01-01 to 2024-12-31, and the verification report is identified by name and date.

missing Total verified emissions removals, usage monitoring, and eligibility status are not stated, limiting public MRV clarity.

Claim Safety

verified No material findings were reported in the verification report, which reduces immediate over-crediting concern.

missing The absence of baseline, leakage, and eligibility details leaves residual risk that the claimed removals are not fully robust.

Documentation

verified Two document types were used, including a verification report and supporting validation/issuance records.

missing Extraction confidence is only medium, and several core fields are not stated in the available record.

Detailed Analysis

Integrity

The verification report for "Verification Of Net Ecosystem Exchange (Nee) Monitoring at System-Level of Hemp Carbon Standard Fields Using Carbon Space Technology Version 1.1" states that additionality was confirmed by the VVB, and it reports no material findings. That supports the project somewhat on integrity. However, the baseline method, leakage deduction, buffer pool, and reversal information are not stated in the available documents, so permanence and baseline robustness remain weakly evidenced.

Transparency

The monitoring period is clearly identified as 2024-01-01 to 2024-12-31, and the VVB is named as Control Union Malaysia. Beyond that, the record does not state verified or claimed ERR totals, usage monitoring method, or eligibility status, which makes the MRV trail incomplete. The medium extraction confidence also suggests the documentation may not be fully legible or complete.

Claim Safety

Claim safety is constrained by missing core accounting details. The report does not state a baseline method, leakage justification, or any verified versus claimed removal totals, so over-crediting risk cannot be well bounded. Because corsia eligibility and CCP status are not stated, the project cannot be treated as clearly excluded from dual-market claim risk.

Documentation

Documentation is only moderate because two document sources were used, but the extracted record still leaves many key fields unstated. The report date is recent, which helps, but the medium extraction confidence lowers trust in completeness. No corrective actions were required, which is positive, but the file still lacks several items needed for a strong documentation score.

Overall

There are no contradictions listed in the extracted record, so no conflict-resolution was needed. I privileged the verification report because it is the most recent and directly relevant document for the monitoring period, but the absence of baseline, leakage, and eligibility details still weighs heavily. Under the scoring rules, the weak documentation does not trigger the transparency cap, and integrity remains above the threshold that would force an overall cap, but the project still scores as only moderate quality.

Audit Analysis

The project has some positive integrity signals because the VVB confirmed additionality and the verification report reported no material findings. However, key baseline, leakage, permanence, and safeguard details are not stated in the available record, which limits confidence in the claimed removals. Overall, this is a moderately weak file with several important evidence gaps rather than a clearly high-quality crediting case.

Project Description

Credits issued: 1,039

Red Flags

  • No baseline method, leakage treatment, or buffer pool information is stated in the available documents.
  • Registry and eligibility status are not stated, so double-claim and market-use risk cannot be ruled out.

Credit Vintages

Issued Retired Available
2024
1,039 0 1,039
Total 1,039 0 1,039

Cosa migliorerebbe questo punteggio

  • Publish the baseline methodology, leakage treatment, and any buffer or reversal provisions used for the 2024 monitoring period.
  • Disclose verified versus claimed removal totals, plus explicit CORSIA and CCP eligibility status in the registry record.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No reversal or buffer evidence stated

Leakage

Leakage treatment not stated

Baseline

Baseline method not stated

Safeguards

No safeguards evidence found

Double-claim

Eligibility status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti