GHG abatement through Solar Power Generation at Jaisal…
CNN-800b4c
Score Breakdown
Integrity
verified No material findings or corrective actions were reported in the extracted record (document type unknown).
missing Additionality approach and baseline method were not found in the extracted record (document type unknown).
Transparency
missing VVB name, monitoring period, and verified emission reductions were not found in the extracted record (document type unknown).
missing Low extraction confidence and only one unidentified document limit auditability (document type unknown).
Claim Safety
missing CORSIA eligibility and CCP status were not found in the extracted record, increasing uncertainty around downstream claims (document type unknown).
missing Over-crediting risk cannot be evaluated because the baseline and grid emission factor were not found in the extracted record (document type unknown).
Documentation
missing Only one evidence document is listed and it is unidentified, with low extraction confidence (document type unknown).
inferred No corrective actions are listed, but the absence of findings may reflect missing/illegible content rather than strong performance (document type unknown).
Detailed Analysis
Integrity
The extracted record does not include the additionality test type, whether additionality was confirmed by the VVB, the baseline method, or any baseline reassessment timing (document type unknown). Leakage treatment (deduction and justification) was also not found, which prevents evaluating displacement or indirect impacts for a grid-connected renewable project. No material findings or corrective actions are shown, but given the low extraction confidence this is weak evidence of robustness rather than a strong positive signal.
Transparency
Core transparency elements are missing from the extracted record: the VVB name, monitoring period, and verified emission reductions are not stated (document type unknown). There is also no grid emission factor value/year or methodology information to allow replication of calculations. With only one unidentified document and low extraction confidence, the public traceability and MRV audit trail are insufficient.
Claim Safety
Because the baseline approach and grid emission factor are not found in the extracted record, the risk of over-crediting cannot be screened (document type unknown). CORSIA eligibility and CCP status are also not stated, creating uncertainty for buyers about whether credits could be used in higher-claim channels. The absence of claimed vs verified ER figures further increases greenwashing risk because performance cannot be cross-checked.
Documentation
Documentation quality is very weak: only one evidence document is listed and it is labeled as unknown, with low extraction confidence (document type unknown). The document date, project name, methodology/version, crediting period, and monitoring period are not found in the extracted record. This level of incompleteness warrants a low documentation score and would trigger the transparency cap under the gate rules (documentation below 3.0).
Overall
No contradictions were identified in the extracted record, but the primary issue is the near-total absence of key project facts needed to assess additionality, baseline validity, MRV, and eligibility. Given low extraction confidence and an unidentified source document, scores are conservatively low across all dimensions. Under the gate rules, the low documentation score would cap transparency post-scoring, and the low integrity score would cap the overall score post-scoring.
Audit Analysis
This Gold Standard solar power project appears to be an avoidance renewable energy activity, but the extracted record contains almost no quantifiable MRV, baseline, or additionality information. With low document readability and only an unidentified source document, the reliability of any crediting claims cannot be substantiated from the available evidence.
Project Description
Precision Technik Private Limited has developed a 5 MW grid connected solar photovoltaic power project in Nokh Village, Pokhran. Tehsil in Jaisalmer District in the State of Rajasthan in Western India. The project activity is expected to supply 8,322 MWh of net electricity annually to the national grid of India (NEWNE).
Red Flags
- Key MRV and crediting data (monitoring period, verified ERs, baseline and grid emission factor) were not found in the extracted record.
- Low extraction confidence and an unidentified document source materially reduce confidence in the project’s documentation and transparency.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2013 (non verificato).
Cosa migliorerebbe questo punteggio
- Provide the latest Gold Standard verification/monitoring report(s) with readable tables showing monitoring period, claimed vs verified ERs, VVB name, and any findings/corrective actions.
- Provide the applied methodology and baseline inputs (grid emission factor value and year, baseline approach, and any leakage assessment/justification) plus public registry links confirming issuance and eligibility statuses.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Additionality not evidenced
Avoidance project but reversal provisions not documented
Leakage treatment not documented
Baseline method not evidenced
Safeguards/FPIC/grievance not evidenced
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
registry_page
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →