Vai al contenuto principale
GS Energy Efficiency - Domestic India Documentazione completa General Methodology v2.0

Native Clean Water Programme South East Asia: NE_VPA 01_IND

GS-685 ↗

5.1 / 10
Integrity
4.8
Transparency
5.6
Claim Safety
4.9
Documentation
5.2

Score Breakdown

Integrity

inferred Additionality is not clearly evidenced in the extracted record, although the project uses the TPDDTEC methodology and was verified by SustainCERT.

missing Reversal risk is weakly handled: the verification report says reversal events were not addressed, and no buffer pool is stated.

Transparency

verified The verification report is from SustainCERT and the monitoring period is clearly stated as 2022-05-01 to 2023-04-30.

missing Total ER claimed and verified are not found in the extracted record, and several cross-document contradictions reduce reporting clarity.

Claim Safety

inferred Leakage is deducted at 0% and described as negligible, but the justification is brief and earlier documentation reportedly did not address leakage.

missing The baseline is project-specific rather than clearly standardized or recently reassessed, and the FNRB value is based on a national default.

Documentation

verified The record includes multiple official documents, with 17 documents used and no material findings or corrective actions reported in the verification report.

missing Extraction confidence is only medium, and the record contains several contradictions on reversal events, usage monitoring, usage rate, leakage treatment, and crediting period.

Detailed Analysis

Integrity

The project is verified by SustainCERT under the TPDDTEC methodology, and the verification report reports no material findings or corrective actions. However, no additionality test type is stated in the extracted record, the baseline is project-specific, and the baseline reassessment date is not found in available documents. Permanence is also weaker because reversal events are described as not addressed, and no buffer pool percentage is stated.

Transparency

The monitoring period is clearly stated, and the verification report provides some structured MRV information, including annual survey-based usage monitoring. That said, total ER claimed and verified are not found in the extracted record, and the record contains contradictions on usage monitoring method and usage rate across documents, which weakens transparency.

Claim Safety

Claim safety is mixed because leakage is treated as negligible with a 0% deduction, but the justification is limited and earlier documentation reportedly did not address leakage. The project also relies on a project-specific baseline and a national-default FNRB approach, which does not strongly support conservative crediting. The usage rate is shown as fully verified in the extracted record, but conflicting historical values reduce confidence in the claim.

Documentation

Documentation quality is moderate: the record draws on 17 documents, includes a named VVB, and reports no material findings or corrective actions in the verification report. However, extraction confidence is only medium, and several contradictions remain unresolved, including reversal events, usage monitoring method, usage rate, leakage treatment, and crediting period. The crediting period is also not fully aligned across sources, which further reduces documentation reliability.

Overall

Overall, this is a mid-quality file with some positive verification and safeguards, but important gaps remain in additionality, permanence, and baseline rigor. I privileged the most recent and specific verification report for reversal treatment and leakage justification, while noting that earlier documents conflict on those points; I also privileged the later monitoring-report value for usage rate where the record shows a direct contradiction. Because the contradictions indicate reliability issues, the scores are held to a cautious middle range.

Audit Analysis

The project has some positive safeguards and a VVB-reviewed verification report, but key evidence gaps remain around additionality, permanence, and baseline robustness. The record also contains several document-level contradictions, which lowers confidence in the claimed reductions and the reliability of the documentation.

Project Description

Developer: NATIVE, A PUBLIC BENEFIT CORPORATION Type: Energy Efficiency - Domestic Size: Micro scale Methodology: GS TPDDTEC v 1. Crediting period: 2019-05-01 → 2029-04-30 Estimated annual credits: 9784 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 6: Clean Water and Sanitation, Goal 3: Good Health and Well-Being, Goal 13: Climate Action

Red Flags

  • No additionality test type is stated in the extracted record, and VVB confirmation of additionality is not found.
  • Reversal handling is unclear: one document says reversal events were not addressed, while an earlier source reportedly said they were reported.
  • Leakage is treated as negligible with a 0% deduction, but the justification is thin and earlier material reportedly did not address leakage.
  • The project uses a project-specific baseline and the baseline reassessment timing is not stated.
  • Contradictions exist on usage monitoring, usage rate, and crediting period across documents.

Credit Vintages

Issued Retired Available
2019
4,167 0 4,167
2020
6,854 0 6,854
2021
7,142 0 7,142
2022
2,348 0 2,348
Total 20,511 0 20,511

Cosa migliorerebbe questo punteggio

  • State and document the additionality test used, with explicit VVB confirmation in the verification materials.
  • Provide a clear reversal management approach, including buffer pool treatment or a formal explanation of why reversal risk is not material, and reconcile the conflicting monitoring and crediting-period records.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No clear test stated

Permanence

Reversal risk not addressed

Leakage

0% deduction, thin justification

Baseline

Project baseline, reassessment missing

Safeguards

FPIC and grievance mechanism present

Double-claim

Registry status not clearly excluding dual claims

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti