Vai al contenuto principale
biodiversity Documentazione completa General Methodology v2.0

Savimbo Biodiversity Credits (Pre-certified)

DV-3d2afb

1.7 / 10
Integrity
1.8
Transparency
1.0
Claim Safety
2.2
Documentation
1.5

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and permanence provisions (e.g., buffer or reversal handling) are not stated in the available extracted record

inferred Safeguards are mentioned, but FPIC, grievance mechanism, and benefit-sharing details are not stated in the extracted record

Transparency

missing Monitoring period, monitoring approach, and any quantified results are not stated in the extracted record

missing Registry, VVB name, and public-facing MRV/assurance details are not stated in the extracted record

Claim Safety

missing No quantified outcomes or verification figures are provided in the extracted record, increasing over-claiming/over-crediting risk

inferred CORSIA and CCP status are not stated in the extracted record, so eligibility-related claim risks cannot be screened

Documentation

missing Only one document is referenced and it is labeled “unknown,” with low extraction confidence

verified No material findings or corrective actions are reported in the extracted record (though this may reflect missing documentation rather than clean assurance)

Detailed Analysis

Integrity

The extracted record does not state any additionality test, baseline method, or baseline reassessment timing, so additionality and baseline robustness cannot be evaluated from the available document(s). Leakage is not addressed (no deduction and no justification found), and permanence provisions such as a buffer pool or reversal monitoring are also not stated in the extracted record. While safeguards are mentioned in the source document, key integrity elements like FPIC, grievance mechanisms, and benefit-sharing are not described.

Transparency

The extracted record provides no monitoring period, monitoring methodology, or usage/field monitoring approach, limiting the ability to audit how biodiversity outcomes are measured. No registry information or VVB identity is provided, and there are no stated claimed-versus-verified results. With only an “unknown” document type and no document date, the public traceability of the project’s MRV is weak.

Claim Safety

Because no quantified outcomes (claimed or verified) are stated in the extracted record, there is a high risk that any public claims could be difficult to substantiate. Baseline and leakage information are missing, which are common drivers of over-crediting risk in outcome-based crediting. CCP and CORSIA eligibility are not stated, so the risk of inappropriate eligibility-related marketing claims cannot be ruled out.

Documentation

Only one evidence document is listed and it is labeled “unknown,” and the minimum extraction confidence is low, indicating at least one key document was poorly readable. The extracted record lacks dates, methodology identifiers, monitoring periods, and assurance details, suggesting incomplete documentation capture. Although the record shows no material findings or corrective actions, this is not strong evidence of quality given the broader documentation gaps.

Overall

No contradictions were identified in the extracted record, so scores are driven primarily by missing information rather than conflicting information. Given the absence of stated additionality, baseline, leakage, permanence provisions, and MRV/assurance details, the project cannot be robustly assessed and is scored very low across integrity, transparency, and claim safety. Note: per the gate rules, a documentation score below 3.0 would cap transparency after scoring.

Audit Analysis

Based on the extracted record, this pre-certified biodiversity credit project lacks the core information needed to assess additionality, baseline validity, leakage, and permanence. With only one poorly readable/low-confidence source document and most key fields not stated, the risk of over-crediting and weak claims is high.

Project Description

This pre-certified biodiversity credit follows all the rules. The best science, full land title, and full monitoring, reporting, and verification. Sold direct from Indigenous Peoples and local communities and listing and trading on international exchanges. You want full credentials and results , this is your credit.  We expect credits to become certified before the end of this year, using our Cercarbono -approved methodology. Who we are Savimbo is a company created by, and for,

Red Flags

  • No baseline approach or reassessment timing found in the extracted record, making it impossible to judge whether credits reflect real, additional outcomes
  • No additionality test or third-party validation/verification body identified in the extracted record
  • No leakage treatment (deduction or justification) found in the extracted record
  • Low extraction confidence and only one “unknown” document source materially reduce reliability and auditability

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Publish and reference the full methodology/baseline approach (including reassessment schedule) and an additionality demonstration, ideally confirmed by an independent VVB
  • Disclose MRV details (monitoring period, indicators, sampling/QA procedures) and provide a clear registry record with issuance/verification documentation and project dates

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Permanence provisions not stated

Leakage

No leakage treatment found

Baseline

No baseline method found

Safeguards

Safeguards mentioned, details missing

Double-claim

CCP/CORSIA status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating

Registry Documents

Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti