Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

ACM0020 — Co-firing of biomass residues for heat generation and/or electricity generation in grid connected power plants

About this methodology

Projects replace part of the fossil fuel burned in heat or power generation with biomass residues. The method measures fossil-fuel emissions avoided and accounts for biomass preparation, transport, and combustion.

Version
1.0.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Industrial energy
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-ACM0020-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Deductions that can apply

  • No additionality test in the documents (renewable energy) A-TEST-NOT-STATED

    Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it (ACM0020 v01.0.0 Leakage, p. 15). Our current method does not assess it. CM-F-ACM0020-LEAKAGE

    Link
  • not assessed

    Sustainability of the feedstock: the methodology sets rules for it (ACM0020 v01.0.0 applicability, p. 3). Our current method does not assess it. CM-F-ACM0020-FEEDSTOCK-SUSTAINABILITY

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0020-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v01.0.0adopted 29 Sept 2011source

    Initial adoption.

Projects using ACM0020

Browse 1 published project using ACM0020, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under ACM0020?

In CarbonMeld's data, ACM0020 projects are on one registry: CDM (1 project, 0 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

  • Harava Solar ParkCDM-VEQOJ76QHP6Clean Development MechanismZimbabweRegistry: Terminated
    Analysis: No rating yet