This is methodology v2.2, superseded on 10 November 2026. Scores marked v2.2 use these rules. Current methodology: Carbon credit rating methodology · What changed between versions

This page describes methodology v2.2, in use since October 2026, and says for each rule which version applies it. Which Version a Project Page Shows

General Methodology v2.2

Carbon Credit Rating Methodology

CarbonMeld gives each project a score from 0 to 10, built from the project's public registry documents and registry records. The score has four dimensions. This page describes how each one is read and limited, which rules apply, and since which version.

  • 4dimensions in every score
  • 1,703rules applied, each with its ID
  • 384methodologies covered
  • 24issuers of those methodologies

How a Score Is Made

  1. Documents The registry's records and the project's public documents
  2. Facts Values read one at a time, each kept only with its quoted passage
  3. Scores Four dimensions, each from 0 to 10, against the project's own methodology
  4. Gates Sector deductions, then caps, then the overall score
  5. Published page Each new text checked against the facts before it is published

How Assessments Are Produced (v2.2, October 2026)

In version 2.2 every project is assessed against the official text of its own methodology. For each methodology and protocol (from CDM, Verra, Gold Standard, ACR, Climate Action Reserve, Puro, Isometric, J-Credit, the UK codes and others) the CarbonMeld team has written evaluation rules from the official methodology document: which criteria apply to that methodology, and which official reference values it sets, each tied to the page of the official text.

What is compared. Three of a project's figures are compared with its own methodology's values, each line citing the methodology: the annual emission reductions with the small-scale limit (within or above; in a programme of activities and in a grouped project the limit applies to each component activity or instance, and the total of the programme or the group is not compared with it) CM-C-SMALL-SCALE-LIMIT; the buffer share with the methodology's share for its version (side by side, and «below that minimum» where the methodology sets a minimum) CM-C-BUFFER-SHARE; and the length of the crediting period (within or not within; a rule in force from a given date is not applied to a period that began before it, and a rule the methodology calls approximate is shown side by side without a verdict) CM-C-CREDITING-LENGTH. The US forest protocols' reversal rule is quoted with its section and page. Since 6 Nov 2026, the fNRB is compared too, where the methodology allows a default fNRB (cookstoves, biogas, water treatment and brick kilns). CarbonMeld shows it beside the country's official value (A6.4-AMT-009 v01.0) and its 30% uncertainty, where the country has one. CM-C-FNRB-OFFICIAL

Other values of the methodology help the analysis read the project's own figures: an emission factor read above the highest value the methodology allows (or a plausibility bound) is not printed CM-R-EF-BOUND; the baseline emissions are never printed as the estimate of the emission reductions CM-E-BASELINE-NOT-ESTIMATE; under the ODS protocols a ten-year period is read as the campaign's crediting window; under the orphan-well protocols a period of up to a year is read as the well plugging. The fNRB and the installed capacity on a page are the project's own figures, as its documents state them; they are not compared with the methodology's values.

  • Facts first. Figures and findings are read from the project's own documents one value at a time, and a value is kept only when the quoted passage is found in the source pages. The published text is written from those verified facts.
  • Dates as written. A date that a document gives only as a month and a year is printed as the month and the year; no day is added. CM-E-MONTH-ONLY-DATES
  • Template text is not a project fact. The wording of a document template — a line that the documents of many developers share, or a form's edition line — is read neither as a fact of the project nor as the date of the document. CM-E-TEMPLATE-TEXT
  • A programme's facts stay the programme's. A document of a whole programme of activities can state a fact, such as a crediting period, its renewal, a methodology or a validation body; our current method does not show such a fact as one unit's own. The programme's statements on additionality and on other registrations apply to every unit. CM-E-PROGRAMME-FACTS
  • The type of an additionality argument. When the documents argue an investment barrier and neither the quoted passage nor its page and the pages beside it hold a calculation (an IRR, an NPV, a benchmark, a payback period), the argument is read as a barrier analysis, not as an investment analysis. CM-E-ADDITIONALITY-TYPE
  • Methodology rules are internal. The rules themselves are working tools and are not published; new methodologies are added as they appear on the registries.
  • Programme status from official sources. ICVCM CCP status is read from the ICVCM's published assessment table, per crediting programme and methodology version, and the table's date is shown.
  • Limits applied in code. The score caps and floors listed below under «Score caps and floors» are applied by code, the same way for every v2.2 project.
  • Checked before publication. Each new text is checked automatically against the verified facts; a text that does not pass is not published. CM-E-TEXT-CHECK

Which Version a Project Page Shows

Projects are re-analysed with the current version in batches. Each project page shows the version its score comes from: «Methodology v2.2 · analysed on …» beside a current score. When the documents of a project analysed under v2.2 change, the project is analysed again; meanwhile its score stays shown, marked «Re-assessment pending» with the date of its analysis. A project analysed under an earlier version (v2.1 or before) shows no score, because that score is not comparable with scores under the current method: its page says «Being reassessed under the current method» and shows the project's registry data, and the new analysis appears there once it is published. An archived project, or one whose score is withdrawn for review, has its own notice instead. Each rule on this page says which version applies it. Scores can move up or down at a re-analysis; the change is shown in the rankings.

Before a New Analysis Is Published

A new analysis is held for review instead of replacing the score online when the overall score falls by more than 1 point, or into a lower band, with nothing changed in the project's documents or registry record; or when it falls below the score online on a page whose documents were not all read. Pages that would print a private person's name are also held. This is a publication rule: it changes no score. CM-E-PUBLICATION-HOLD

A reader can release a held analysis after a check against the documents. The release covers that exact analysis only. CM-E-READER-RULING

Four Dimensions, Weights and Bands

  • Integrity 35%
  • Transparency 25%
  • Claim safety 25%
  • Documentation 15%
Dimension Weight What is assessed
Integrity 35% Additionality, quality and conservatism of baseline, permanence risk, leakage
Transparency 25% Public availability of data, accessible MRV, public PDD, findable official registry record
Claim Safety 25% Greenwashing risk for the buyer, ICVCM CCP eligibility, the age of the credits' vintage. CORSIA labels are read and shown; not having one never lowers a score.
Documentation 15% Availability of PDD, monitoring reports, third-party verification reports

overall = integrity × 0.35 + transparency × 0.25 + claim_safety × 0.25 + documentation × 0.15

The weights are the same in every sector and in both versions. Sectors differ through the rules of each methodology (v2.2) and through the sector penalty gates described below. CM-E-OVERALL-WEIGHTS

Score Bands

Each dimension is scored in these bands (scoring rubric 2.1, the same text for every project):

Range Meaning
9 – 10 Excellent, best practice — only with strong documentary evidence
7 – 8 Good: solid evidence, minor concerns
4 – 6 Mixed: some concerns, or limited evidence. A dimension with insufficient information is scored 4.0–5.0 CM-E-INSUFFICIENT-INFORMATION
0 – 3 Low: a serious problem the documents show (for example no additionality demonstration, an inflated baseline, no findable registry record)

Evidence Scope and Confidence

Evidence scope says what the analysis could read. Confidence says how much weight the resulting score can bear. Both are computed by code from what was read, never by the AI model, and neither changes the score itself: a 6.8 with high confidence is not equivalent to a 6.8 with low confidence.

Evidence scope (v2.2)

Scope What it means
registry docs At least one of the project's registry documents was read
registry only No document was read; the registry's own records of the project (its issuance rows) were
marketplace-only Neither: only a marketplace listing

v2.1 analyses used three other values: Registry-grade, Partial and Marketplace-only.

Confidence (v2.2)

High: the project is at a verified stage, we read at least one monitoring or verification report of the project and at least 2 of its documents, and no rejected answer of the model counts against it. Since 6 Nov 2026, a rejected answer counts only when it leaves a fact of the analysis unsettled: an answer that gives a verification or a monitoring period with no amount does not count, nor one whose fact the analysis has from another source (another answer or document, the registry, or a rule of the methodology or the programme; for an amount, accepted amounts whose periods cover the rejected one's). Before, every rejected answer counted. Medium: at least 1 document read. Low: none read. The page shows the label these rules give, after the two steps below. CM-E-CONFIDENCE

The registry status gate caps confidence at «low» (rejected, withdrawn, not delivered). Stale monitoring data lowers confidence one level. An analysis made before this rule entered the current method (1 Nov 2026) keeps the confidence of its own analysis, except that a «high» resting on stale monitoring data is shown as «medium». CM-E-STALE-CONFIDENCE

v2.1 analyses derived confidence from the evidence scope, the gates' coverage and the vintage flag: high with verified registry documents and complete data, shown only once a full validation confirmed the analysis; medium with some documents absent or not recent; low with no registry documents, or with stale data and a medium base.

Standards and Methodologies Covered

CarbonMeld's catalogue holds 384 methodologies from 24 issuers. 349 of them have rules of their own; the others are read with the general rules. 10 standards also have rules of their own. Each methodology links to its own page.

By standard

Catalogued methodologies and rules, by standard or issuer
Standard or issuer Methodologies With rules of their own Rules of the standard
CDM (UNFCCC) 209 206 1
Verra (VCS) 54 37 1
American Carbon Registry (ACR) 22 17 0
Climate Action Reserve (CAR) 21 18 0
Gold Standard (GS) 15 12 1
Label Bas-Carbone (LBC) 14 13 0
Isometric 9 9 0
Puro.earth (PUR) 5 5 0
BCarbon 4 4 8
California Air Resources Board 4 4 0
Global C-Sink 3 3 0
J-Credit 3 3 0
Oncra 3 3 0
Plan Vivo (PV) 3 3 14
City Forest Credits (CFC) 2 2 15
Global Carbon Registry (GCR) 2 0 0
Ministry of the Environment, Japan (J-VER scheme) 2 2 0
Washington State Department of Ecology 2 2 0
ART TREES 1 1 15
Hemp Carbon Standard (HCS) 1 1 0
Rainbow Standard 1 1 0
Skógarkolefni (Forest Carbon Code), Land and Forest Iceland 1 1 0
UK Peatland Code (PC) 1 1 17
UK Woodland Carbon Code (WCC) 1 1 17
Other (no issuer in the catalogue) 1 0 0
Universal Carbon Registry (UCR) 0 0 1
Total 384 349

«Rules of the standard» are the rules listed for the standard as a whole; its page shows them. A standard is linked when it has a ranking.

By project type

  • Energy efficiency and fuel switching 59
  • Forests, wetlands and land use 57
  • Agriculture and livestock 41
  • Electricity and heat generation 38
  • Waste and wastewater 38
  • Industry and materials 36
  • Transport and transport fuels 22
  • Carbon removal and storage 21
  • Oil, gas and mine methane 18
  • Industrial gases and refrigerants 18
  • Cooking, household energy and water 15
  • Not yet classified 21

The types group the catalogue's activity field. «Not yet classified»: the catalogue gives no activity for the methodology yet.

Every methodology

Each list is closed until opened. A methodology marked «general rules only» has no rule of its own.

CDM (UNFCCC) 209 methodologies

Other standards, Verra among them, also accept CDM methodologies; each one is listed once, under the CDM. the standard's page

Verra (VCS) 54 methodologies

the standard's page

American Carbon Registry (ACR) 22 methodologies

the standard's page

Climate Action Reserve (CAR) 21 methodologies

the standard's page

Gold Standard (GS) 15 methodologies

the standard's page

Label Bas-Carbone (LBC) 14 methodologies

the standard's page

Isometric 9 methodologies

the standard's page

Puro.earth (PUR) 5 methodologies

the standard's page

BCarbon 4 methodologies

the standard's page

California Air Resources Board 4 methodologies
Global C-Sink 3 methodologies

the standard's page

J-Credit 3 methodologies

the standard's page

Oncra 3 methodologies

the standard's page

Plan Vivo (PV) 3 methodologies

the standard's page

City Forest Credits (CFC) 2 methodologies

the standard's page

Global Carbon Registry (GCR) 2 methodologies

the standard's page

Ministry of the Environment, Japan (J-VER scheme) 2 methodologies
Washington State Department of Ecology 2 methodologies
ART TREES 1 methodology

the standard's page

Hemp Carbon Standard (HCS) 1 methodology

the standard's page

Rainbow Standard 1 methodology

the standard's page

Skógarkolefni (Forest Carbon Code), Land and Forest Iceland 1 methodology
UK Peatland Code (PC) 1 methodology

the standard's page

UK Woodland Carbon Code (WCC) 1 methodology

the standard's page

Other (no issuer in the catalogue) 1 methodology

Official Sources Used

We periodically cross-check our project coverage and our issued / retired totals against the Voluntary Registry Offsets Database (VROD), published by the Berkeley Carbon Trading Project at UC Berkeley. Small differences between our figures and the VROD are normal: they arise from the dates of each data pull, different registry coverage (the VROD covers fewer registries than CarbonMeld reads), and how cancelled or converted credits are counted.

Haya, B. K., Quartson, P., Bernard, T., Abayo, A., Rong, X., So, I. S., & Elias, M. (2026). Voluntary Registry Offsets Database, v2026-08. Berkeley Carbon Trading Project, University of California, Berkeley. gspp.berkeley.edu. Licensed under CC BY 4.0.

Scoring Rules, Caps and Gates

Each rule below carries its ID in our rules registry. The ID stays the same from version to version, so it can be cited: a link to the ID on this page opens the rule. A rule marked «planned» is not applied yet.

Score Caps and Floors (v2.2)

In v2.2 these limits of the bands are applied by code after the scorer has given its figures, the same way for every project. A cap is a ceiling: it lowers a figure above it and leaves a lower one as it is.

Integrity cap max 5.0

Integrity and Transparency at most 5.0 when no validation or verification report could be read: this is the rubric's «insufficient information» band. CM-E-INSUFFICIENT-INFORMATION

Link
Claim safety cap max 7.5

Claim Safety at most 7.5 when the programme has no CCP-approved methodology for the project (if the CCP label does not apply to the programme, as for a compliance programme, this condition does not apply), or when the credits' vintage is 5 years old or more. CM-E-CAP-CLAIM-SAFETY-CCP

Link
Claim safety cap max 6.5

Claim Safety at most 6.5 when the ICVCM did not approve the methodology and the vintage is 5 years old or more. CM-E-CAP-CLAIM-SAFETY-NOT-CCP-OLD

Link
Documentation cap max 6.5

Documentation at most 6.5 when credits have been issued but no monitoring or verification report could be read. CM-E-CAP-DOCUMENTATION-NO-REPORT

Link
Documentation cap max 7.5

Documentation at most 7.5 unless a verification report was read and a monitoring or verification report is less than 2 years old: 8–10 needs both. CM-E-CAP-DOCUMENTATION-RECENT

Link
Documentation shown min 4.0

Floors. In that band, Integrity and Transparency are at least 4.0 when no adverse fact was read and no sector deduction lowered that score. Documentation is at least 4.0 when a PDD and a validation, verification or monitoring report were read. CM-E-DOCUMENTATION-FLOOR

Link

v2.1 analyses used the same bands as guidance to the scorer, without these limits in code.

Standing Rules for the Scorer (v2.2)

Claim safety shown

Under our current method, some facts never lower a score on their own: an ICVCM CCP status that is «pending» or «not assessed» (it only keeps a project out of the 8–10 band); a criterion the project's methodology marks as not applicable; a finding the documents leave undeterminable; and the absence of CORSIA eligibility. CM-E-NOT-APPLICABLE-NEVER-GAP CM-E-CCP-CLAIM-SAFETY

Link
Integrity shown

Additionality given by the methodology itself — a positive list, a micro-scale rule, the protocol's own tests — is not marked down for lacking a project-level demonstration. CM-E-ADDITIONALITY-GIVEN

Link
shown

Our reading limits never count against a project. When we could not read a document (a scan without text, a file that would not open), that gap bears on no dimension of the score. If the scorer's reasoning rests on it, the question is asked again; if it still does, the page is not published. CM-E-OWN-LIMITS

Link
shown

Each dimension rests only on its own facts. When the scorer's reason for one dimension cites a fact that belongs to another dimension, the question is asked again without that fact. CM-E-DIMENSION-OWN-LINES

Link

Sector Classification

Each project is automatically classified into one of the following sectors using a deterministic keyword-matching system. Classification is based on the project's credit type, name, and description — checked in that priority order. No AI model is involved in classification.

Sector Examples
redd REDD+, avoided deforestation, forest protection
arr Afforestation, reforestation, revegetation
cookstoves Clean cooking, improved cookstoves, fuel-efficient stoves
biogas Biogas digesters, biogas development
biomass Biomass cogeneration, rice husk, bio-oil, wood pellet
renewable_energy Wind, solar, hydro, geothermal, run-of-river
methane Landfill gas, coal mine methane, methane destruction
biochar Biochar production and application
dac Direct air capture
blue_carbon Mangroves, seagrass, saltmarsh, coastal wetlands
soil_carbon Carbon farming, agroforestry, agricultural land management
water Safe water access, water purification, boreholes
industrial Energy efficiency, waste heat recovery, fuel switching, composting, waste-to-energy
other Projects that do not match any of the above

Each project page displays which sector classification was applied.

Combination Rules and Gates

The linear formula can be too lenient when one dimension has a serious problem. Gates are applied by code, after the scorer's figures; the order is given at the end of this section.

Universal gates

shown
Integrity gate

If Integrity is below 4.0, the overall score is capped at 6.0. A structural additionality problem cannot be masked by strong documentation.

Applied in v2.1 and in v2.2 analyses. CM-E-OVERALL-WEIGHTS

Link
Transparency deduction −1.0
Documentation gate

If Documentation is below 3.0, the Transparency score is reduced by 1.0. In the band of insufficient information, the reduction stops at the band's floor of 4.0, unless a sector gate lowered transparency. Transparency depends partly on access to underlying documents. When documentation is severely limited, the transparency score is constrained accordingly.

Applied in v2.1 and in v2.2 analyses. CM-E-DOCUMENTATION-PENALTY

Link
Integrity deduction −3.0
Registry status gate

When the registry lists the project as rejected, Integrity and Claim Safety are each reduced by 3.0; when it lists the project as withdrawn, or as not delivered, by 2.5. The registry status is shown first among the red flags, and the confidence is at most «low». Any other registry status changes no score: it is shown on the page.

Applied in v2.1 and in v2.2 analyses. CM-E-REGISTRY-STATUS

Link
shown planned: not applied yet
VVB verification check

If the additionality test is present but not confirmed by a Validation/Verification Body, and the additionality semaphore is green, it is downgraded to yellow. This does not affect the numerical score.

Our current method does not apply it. Some earlier (v2.1) analyses applied it. CM-E-VVB-ADDITIONALITY-LIGHT

planned Link
Claim safety cap max 5.0
Legal-proceedings cap

When the project's own latest monitoring report states an ongoing criminal investigation or proceeding in which the project company is named as a suspect or defendant, Claim Safety is at most 5.0. It never affects Integrity. The cap is lifted when a later monitoring report states the case closed or dismissed. Insolvencies in which the project company is a creditor, civil disputes and closed cases do not trigger it. We rely only on what the project's documents disclose: some standards' forms ask about legal proceedings and others do not.

Applied in v2.2 analyses. CM-E-LEGAL-PROCEEDINGS-CAP

Link

Sector-specific penalty gates

These gates apply additional penalties to projects in specific sectors where certain risks are structurally important. Each gate reads a fact from the project's documents. Gates that check for absent information only fire when project documents were read — a project with no documents read is not penalized for missing fields, and in v2.2 a gap counts only where the documents read do not address the point, never where the methodology's rules mark it not applicable.

Which version applies these gates. All of them apply to v2.1 analyses. In v2.2 they apply where the v2.2 analysis reads the fact (each gate below says so); the deduction comes before the score caps above, so a project is never penalised twice for one gap.

Forest and land useredd · arr · land
GateEffectVersions
Forest and land use — Leakage assessment

If leakage is not addressed or not documented in available project documents, Integrity is reduced by 1.5 points. For REDD+ and ARR projects, the absence of any leakage documentation is treated as a structural red flag — unlike sectors such as biochar where leakage is not a primary concern. Our current method also applies it to wetland, peatland, grassland, soil carbon and Plan Vivo projects whose methodology requires a leakage assessment. It never applies to VM0033 and VM0036, which consider leakage absent under their conditions. At the listing stage, this gate does not apply when the programme's listing form has no section on leakage (the Climate Action Reserve's forest, grassland and soil enrichment forms, ACR's GHG Project Listing Form, Verra's draft project description for a listing as under development). It applies from the first stage whose required documents cover leakage.

Integrity deduction −1.5

Applied in v2.1 and in v2.2 analyses. CM-G-LEAKAGE-NOT-ADDRESSED

Forest and land use — Buffer pool disclosure

If the buffer pool percentage is not disclosed in available documents, a red flag is added. No score penalty is applied — the AI evaluator already factors buffer pool adequacy into its assessment. Our current method also applies it to wetland, peatland, grassland, soil carbon and Plan Vivo projects whose methodology requires a buffer. At the listing stage, no flag is added when the programme's listing form has no section on the buffer pool.

shown

Applied in v2.1 and in v2.2 analyses. CM-G-BUFFER-NOT-DISCLOSED

Cookstoves, biogas, water treatment and brick kilnscookstoves · biogas · water · brick_kilns
GateEffectVersions
Avoided biomass — older default fNRB

If the fraction of non-renewable biomass (fNRB) is an older CDM default value, Claim Safety is reduced by 1.0 point. Older defaults are the TOOL33 values before version 03.0, the older national defaults and any other value the documents give as a default, such as 0.8 or 0.9; such defaults overestimate fNRB in many regions. A current official value takes no deduction: CDM TOOL33 v03.0 (12 June 2025) and the Article 6.4 tool A6.4-AMT-009 (in force from 21 May 2026). An assessment with MoFuSS 2024 or later takes none either. The CDM fixed default of 0.3 (TOOL30, adopted at EB 97) is not an older default: this gate makes no deduction for it, and the next gate compares it with the official value like any other value. Where the documents do not show the source, there is no deduction. Our current method applies it to every project credited for avoided non-renewable biomass whose methodology allows a default fNRB: cookstoves (AMS-I.E among them), biogas (the Gold Standard methodology for manure biogas), water treatment (AMS-III.AV, the Gold Standard methodology for safe drinking water) and brick kilns (AMS-III.Z). Where the documents apply methodologies together (a bundle, such as AMS-I.C or AMS-III.R with AMS-I.E), the fNRB gates also apply to the bundle's fNRB part, and the reason names that part and its version. The Gold Standard methodology for small-scale biodigesters requires the project's own assessment, and VM0017 uses the fNRB only to deduct leakage, so neither takes it.

Claim safety deduction −1.0

In the current method since 1 Nov 2026. Changed on 6 Nov 2026: older defaults only. CM-G-FNRB-NATIONAL-DEFAULT

Avoided biomass — fNRB above the official value

CarbonMeld compares the project's fNRB with the official national value of its country in A6.4-AMT-009 v01.0 (Table 3; the same values as CDM TOOL33 v03.0). If the project's value is higher by more than the tool's uncertainty, 30% of the value (para 15), Claim Safety is reduced by 0.5 point, and by 1.0 point above 2× the official value. This does not apply to a value from TOOL33 v03.0 or the A6.4 tool, to an assessment with MoFuSS 2024 or later, or where the documents do not show the source. So a value whose source the documents do not show takes neither fNRB deduction, however far above the official value it is: a known gap of the current method. A page takes only one fNRB deduction, the larger one. Where the country has no national value, there is no comparison. Where the methodology discounts a calculated value (VM0050: 26%), CarbonMeld compares the value the project applies. Each page shows the project's value next to the official one.

Claim safety deduction −0.5 −1.0 above 2× the official value

In the current method since 6 Nov 2026. CM-G-FNRB-ABOVE-OFFICIAL

Avoided biomass — usage monitoring

If usage monitoring is assumed or not stated (rather than measured through smart meters, surveys, or self-reporting), Claim Safety is reduced by 0.5 points. Our current method applies it to cookstoves, and to biogas and water treatment where the methodology asks for a usage or operation survey (AMS-III.R, AMS-I.I, the Gold Standard methodology for manure biogas, AMS-III.AV, the Gold Standard methodology for safe drinking water). The Gold Standard methodology for small-scale biodigesters measures the fuel that households use instead, so it takes no deduction. It does not apply before the first monitoring period. A usage check by the verifier, operation logs and the share of units still in operation count as usage monitoring. One fNRB gate and this gate can stack: together they reduce Claim Safety by at most 1.5.

Claim safety deduction −0.5

Applied in v2.1 and in v2.2 analyses. CM-G-NO-USAGE-MONITORING

Renewable energy, power generation and supplyrenewable_energy
GateEffectVersions
Renewable energy, power generation and supply — Additionality test

If no additionality test type is documented, Integrity is reduced by 1.0 point. For renewable energy, power generation and supply projects, the absence of an additionality demonstration is the primary risk — unlike other sectors where a missing field may simply indicate incomplete document extraction. Our current method applies it to renewable energy projects, for power, heat or mechanical energy, and to the other power methodologies: grid connections, transmission lines and new gas plants (ACM0025, AM0029, AM0074).

Integrity deduction −1.0

Applied in v2.1 and in v2.2 analyses. CM-G-ADDITIONALITY-TEST-NOT-STATED

Biocharbiochar
GateEffectVersions
Biochar — Permanence claim

If the durability claim (in years) is not stated in available project documents, Integrity is reduced by 1.0 point and a red flag is added. For biochar, the permanence claim is the core of the credit's value proposition — its absence in otherwise available documents is a structural gap.

Integrity deduction −1.0

Applied in v2.1 and in v2.2 analyses. CM-G-PERMANENCE-CLAIM-NOT-STATED

Biochar — End-use tracking

If the end use of the biochar (soil application, construction materials, or other sinks) is documented as not tracked, Claim Safety is reduced by 1.0 point.

Claim safety deduction −1.0

Applied in v2.1 and in v2.2 analyses. CM-G-END-USE-NOT-TRACKED

Biochar — Feedstock sustainability

If feedstock sustainability is documented as not addressed, Claim Safety is reduced by 0.5 points and a red flag is added.

Claim safety deduction −0.5

Applied in v2.1 and in v2.2 analyses. CM-G-FEEDSTOCK-NOT-ADDRESSED

Methanemethane
GateEffectVersions
Methane — Legally required capture

If gas capture is legally mandated (e.g. landfill gas collection required by regulation), Integrity is reduced by 2.0 points and a red flag is added. Where capture is required by law, the additionality of carbon finance is in doubt. When the documents show that the baseline already deducts the legally required amount, so that only the amount beyond the law is credited, there is no reduction and no red flag: the page states the fact. CM-E-CAPTURE-IN-BASELINE

Integrity deduction −2.0

Applied in v2.1 and in v2.2 analyses. CM-G-CAPTURE-LEGALLY-REQUIRED

Methane — Modeled baseline

If the emissions baseline is modeled rather than measured, Claim Safety is reduced by 0.5 points.

Claim safety deduction planned: not applied yet −0.5

Our current method does not apply it. Some earlier (v2.1) analyses of methane projects applied it. CM-G-METHANE-MODELED-BASELINE

DACdac
GateEffectVersions
DAC — Energy source

If the capture process is powered by fossil energy, Integrity is reduced by 1.5 points.

Integrity deduction planned: not applied yet −1.5

Our current method does not apply it. Some earlier (v2.1) analyses of DAC projects applied it. CM-G-DAC-FOSSIL-ENERGY

DAC — Lifecycle assessment

If project documents state that no lifecycle assessment (LCA) exists, Claim Safety is reduced by 1.0 point. If available documents simply do not mention an LCA, a red flag is added without a score penalty.

Claim safety deduction planned: not applied yet −1.0

Our current method does not apply it. CM-G-DAC-NO-LCA

DAC — Storage verification

If CO₂ storage is documented as not independently verified, Integrity is reduced by 1.0 point. If available documents do not mention independent storage verification, a red flag is added without a score penalty.

Integrity deduction planned: not applied yet −1.0

Our current method does not apply it. CM-G-DAC-STORAGE-NOT-VERIFIED

Sectors not listed above (biomass, blue_carbon, soil_carbon, water, industrial, other) are classified for informational purposes and receive the universal gates only.

Order of application

v2.1: 1. the documentation gate, then the overall score, then the integrity gate; 2. the sector penalty gates one after another, the overall score and the integrity gate recomputed after each; 3. every figure kept within 0–10.
v2.2: the scorer's figures, then the sector penalty gates, then the score caps, the documentation gate and the floors, then the overall score with the integrity gate, then the registry status gate; every figure kept within 0–10. CM-E-GATE-ORDER

Each project page lists the gates applied to its score under "Gates applied", in the Premium details: each gate's name and its deduction or cap.

Vintage Assessment

Each project receives a vintage flag from the age of its monitoring data. In v2.2 the date is the end of the latest verified monitoring period the documents print (else of the latest monitoring period), and a later vintage the registry has issued counts instead when there is one. v2.1 analyses used the latest year mentioned in the monitoring period. CM-E-VINTAGE-FLAG

Flag Condition Effect
recent Monitoring data less than 3 years old No effect
aging Monitoring data from 3 to under 5 years old No effect on score
stale Monitoring data 5 years old or more Confidence one level lower (v2.1 and v2.2) CM-E-STALE-CONFIDENCE
unknown No monitoring period in the documents No penalty. v2.2 shows the period as unknown; v2.1 analyses treated the project as «recent»

The vintage flag never changes the numerical score. The age of the credits' own vintage does: in v2.2 a vintage 5 years old or more caps Claim Safety (see «Score caps and floors»).

Semaphore Indicators

Each project has six risk indicators, each shown as a traffic-light signal beside the numerical score. In v2.2 a light is assessed where the project's methodology rules cover that risk; a light the analysis did not assess is grey («not assessed») and is never a judgement. Safeguards and leakage are grey on most v2.2 pages today.

Indicator What it measures
Additionality Is there evidence the project would not have happened without carbon finance?
Permanence How robust is the mechanism preventing reversal of emission reductions?
Leakage Is emissions displacement outside the project boundary accounted for?
Baseline Is the emissions baseline conservative and well-documented?
Safeguards Are environmental and social safeguards in place and monitored?
Double-claim Is there risk of the same reduction being claimed by multiple parties?

What Would Improve

Each project assessment includes a «what would improve» field listing actions that could raise the project's score, such as publishing a more recent monitoring report. In v2.2 it is written from fixed templates for the gaps the analysis found, never by a model. In v2.1 analyses it was generated by the AI evaluator.

Versions and Governance

Version Log

Version Date Changes
v2.2 2026-10-04 Added: each project assessed against the official text of its own methodology (evaluation rules per methodology and protocol, official values cited by page); facts verified against the source documents one value at a time; ICVCM CCP status from the official assessment table; the rubric 2.1 score caps and floors applied in code; the scorer's standing rules (CCP pending or not assessed is neutral, not applicable is never a gap, no CORSIA label never lowers a score, methodology-given additionality is not marked down, our reading limits bear on no dimension); the legal-proceedings cap; automatic checks before publication.
Changed: confidence (from the documents read, see above); the vintage flag (end of the printed period, or a later issued vintage; «unknown» when there is none); evidence scope (registry docs / registry only / marketplace-only); «what would improve» written from fixed templates, not by a model.
Not carried over: the VVB light check, the modeled-baseline gate and the three DAC gates (no reading of those facts yet). The other sector penalty gates and the stale-data confidence step were brought back on 1 Nov 2026.
Unchanged: the four dimensions and their weights, the integrity gate, the documentation gate, the sector classification, the registry status gate.
v2.1 2026-08-22 Sector-specific penalty gates extended to biochar (permanence claim, end-use tracking, feedstock sustainability), methane (legally mandated capture, modeled-only baseline), and DAC (fossil energy source, lifecycle assessment, storage verification). Extraction schema extended from 40 to 49 structured fields.
v2.0 2026-03-29 Sector classification (14 sectors). Sector-specific penalty gates for REDD+/ARR, cookstoves/biogas, and renewable energy. Vintage assessment with confidence downgrade. Semaphore indicators documented. "What would improve" field documented.
v1.0 2026-03-16 First public version. 4 dimensions, weights 35/25/25/15, Integrity gate and Documentation gate.

Rule Changes

Every change to a rule of our method, newest first, as our rules registry records it, with the day the change was introduced.

Governance

The scores published in the database are generated by a standardized pipeline applied to documentary inputs. Commercial relationships and paid access do not modify the methodology criteria and do not guarantee specific results for any project.

Methodology updates are versioned and logged above. New analyses use the current version; each project page shows the version of its own analysis (see «Which Version a Project Page Shows»).

See also: Editorial Policy · About the System

What Is Not Considered

  • Market price — the score does not account for the credit price
  • Buyer or seller reputation
  • Unofficial third-party opinions or reviews
  • Non-public communications with project developers
  • On-chain transaction history for tokenised credits

A score is not a certification, financial recommendation, or guarantee of environmental outcome.

Previous Methodology Versions

v2.1 — General Methodology (2026-08-22)

The scoring criteria of v2.1 are the ones described on this page. v2.2 keeps its framework; each rule on this page says which version applies it. The other difference is the evidence process (see «How Assessments Are Produced»). Projects analysed under v2.1 show no score until their new analysis under v2.2 is published; their pages say «Being reassessed under the current method» and show the registry data (an archived project, or one whose score is withdrawn for review, has its own notice).

v2.0 — General Methodology (2026-03-29)

Overview

Version 2.0 introduced sector classification (14 sectors) and the first sector-specific penalty gates, on top of the universal scoring framework inherited from v1.0.

Sector Gates in v2.0

Sector-specific penalty gates applied only to REDD+/ARR (leakage assessment, buffer pool disclosure), cookstoves/biogas (fNRB methodology, usage monitoring), and renewable energy (additionality test). Biochar, methane, and DAC projects were classified but received the universal gates only.

What Changed in v2.1

  • Penalty gates extended to biochar (permanence claim, end-use tracking, feedstock sustainability)
  • Penalty gates extended to methane (legally mandated capture, modeled-only baseline)
  • Penalty gates extended to DAC (fossil energy source, lifecycle assessment, storage verification)
  • Extraction schema extended from 40 to 49 structured fields
v1.0 — General Methodology (2026-03-16)

Overview

Version 1.0 used a common rubric for all project types. This was a deliberate choice to ensure comparability, but introduced limitations: sector-specific risks were underrepresented.

Dimensions and Weights

Identical to v2.0: Integrity (35%), Transparency (25%), Claim Safety (25%), Documentation (15%).

Gates

Only two universal gates were applied. No sector-specific gates existed.

Integrity gate

If Integrity below 4.0, overall capped at 6.0.

Documentation gate

If Documentation below 3.0, Transparency reduced by 1.0.

Hard and Discretionary Criteria

Hard criteria were objectively verifiable conditions with a defined weight: public PDD present limits Documentation ceiling; third-party verification report limits Documentation ceiling; findable registry record is positive for Transparency; CORSIA eligibility is positive for Claim Safety. Discretionary criteria — baseline quality, additionality strength, permanence risk, leakage quantification — were evaluative and did not express as fixed increments.

Project Types and Limitations

Project type Primary undifferentiated risk
REDD+ / Forest Carbon Permanence is critical; weight did not fully capture sector specificity
ARR (Afforestation/Reforestation) Additionality requires demonstration of counterfactual land use
Biochar Century-scale permanence is difficult to verify with standard criteria
DAC (Direct Air Capture) Greenwashing risk from "permanent removal" claims
Methane destruction Additionality tied to local regulation
Cookstoves Energy consumption baseline difficult to verify in the field

What Changed in v2.0

  • Projects are now classified into 14 sectors, enabling targeted risk assessment
  • Sector-specific penalty gates reduce scores when key documentation is absent or inadequate
  • Vintage assessment tracks recency of monitoring data and adjusts confidence accordingly
  • Semaphore indicators and "what would improve" fields are now documented in the methodology
  • Confidence is computed deterministically from document availability, gate coverage, and vintage — not by the AI model

Watch: Methodology · YouTube