Grid emission factor: the methodology sets rules for it in some cases (ACM0022 v03.0 applicability para 4, p. 5). CarbonMeld reads it in the project's documents. CM-F-ACM0022-GRID-EF
ACM0022 — Alternative waste treatment processes
About this methodology
Projects treat organic waste through alternatives such as composting, digestion or energy recovery instead of disposal that generates methane. The method measures avoided methane and eligible energy-related emission reductions.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 3.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Waste
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (63 projects)
- Global Carbon Council (GCC) (10 projects)
- Gold Standard (GS) (8 projects)
3 more
- CerCarbono (CC) (1 project)
- Global Carbon Registry (GCR) (1 project)
- Universal Carbon Registry (UCR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it in some cases (ACM0022 v03.0 §5.5, p. 35). Our current method does not assess it. CM-F-ACM0022-LEAKAGE
- not assessed
Tracking of the end use: the methodology sets rules for it in some cases (ACM0022 v03.0 §5.5, p. 35). Our current method does not assess it. CM-F-ACM0022-END-USE-TRACKING
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0022-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v03.0adopted 9 Sept 2021source
Address inconsistencies and ambiguities identified in the methodology.
-
v02.0adopted 28 Nov 2014source
Introduce standardized approaches for the demonstration of additionality; Introduce the balance method for determining fossil fraction of wastes; Improve the provision for the use of this methodology in a project activity under a PoA.
-
v01.0.0adopted 13 Sept 2012source
Initial adoption.
Projects using ACM0022
Browse 97 published projects using ACM0022, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0022?
In CarbonMeld's data, ACM0022 projects are on 7 registries: Verra (63), CDM (13) and Global Carbon Council (10), and 4 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 63 | 28 | See the list |
| CDM (UNFCCC) | 13 | 8 | See the list |
| Global Carbon Council (GCC) | 10 | 0 | See the list |
| Gold Standard (GS) | 8 | 5 | See the list |
| CerCarbono (CC) | 1 | 1 | See the list |
| Global Carbon Registry (GCR) | 1 | 0 | See the list |
| Universal Carbon Registry (UCR) | 1 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
8 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not yet assessable
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Rating withdrawn — under review
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Too early to rate
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not yet assessable
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No rating yet