The project of Kitchen and catering waste Disposal Phase II in Wuchang area
#591of 1084 in China#681of 1339 in Verra (VCS)#11of 31 in ACM0022
Audit Analysis
A VCS waste-disposal project in Wuchang, China, with VVB-verified additionality and inherently low reversal risk, but undermined by a project-specific baseline, contradictory leakage treatment across documents, a material GWP error (N₂O at 298 instead of 265), and six material findings that required 12 clarification and 7 corrective-action requests. The identical claimed and verified ERR figures (641,226) suggest the verification confirmed the ex-ante PDD estimate rather than independently measured performance, limiting confidence in the credit quantity.
Red Flags
- GWP value for N₂O erroneously stated as 298 instead of 265 (IPCC AR5), overstating N₂O-related reductions by roughly 12% until corrected
- Project emissions from incineration of dewatered digestate were initially omitted from the ER estimation, meaning the original credit quantity was overstated
- Leakage treatment is contradictory: the PDD (May 2023) deems leakage negligible while the validation report (Sep 2024) describes it as quantified, and the leakage deduction percentage is not stated in any document
- Capture of methane is stated as legally required in an appendix but not in the validation report, creating ambiguity about whether the project is truly additional
- Total ERR claimed and total ERR verified are identical (641,226), indicating the verification confirmed the PDD estimate rather than independently verifying measured performance
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test, but material findings flagged
Waste-disposal project; methane destroyed not stored; revers
Contradictory treatment (negligible in PDD, quantified in va
Project-specific modeled baseline; last reassessment date no
FPIC conducted, grievance mechanism present, safeguards expl
CORSIA eligibility and CCP status not stated in any availabl
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →