VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredACM0022

Puning MSW Incineration and Power Generation

VCS-4754 ↗

#983of 1329 in Industrial#914of 1084 in China#1046of 1339 in Verra (VCS)#20of 31 in ACM0022

4.4/ 10
Integrity
4.8
Transparency
4.2
Claim Safety
4.5
Documentation
3.8

Audit Analysis

The Puning MSW incineration project has a VVB-confirmed investment additionality test and a registered VCS status, but suffers from significant documentation gaps and internal contradictions. Safeguards (FPIC, grievance mechanism) are absent, leakage is set at 0% with no justification, and the validated ERR figure is 55% higher than the PDD ex-ante estimate. The low extraction confidence and multiple conflicting entries across two validation reports undermine confidence in the data record.

Red Flags

  • Eight fields show contradictions between the two validation reports (Aug 2024 vs Dec 2024), including safeguards, FPIC, grievance mechanism, leakage justification, and additionality test type — indicating either a major revision or data-entry inconsistency
  • Leakage deduction is 0% with no stated justification in the most recent validation report, despite one earlier report describing it as 'quantified' — a material inconsistency for a waste-to-energy project where diversion of MSW to other uses is a realistic leakage pathway
  • No FPIC, no grievance mechanism, and no safeguards documentation found in the most recent validation report, which is a significant gap for a community-adjacent waste incineration facility in China
  • The validated ERR of 1,461,700 tCO2e is 55% higher than the PDD ex-ante estimate of 940,030 tCO2e, and the monitoring period is not stated, making it impossible to verify whether this represents over-crediting or a legitimate revision
  • Min extraction confidence is rated 'low', and one evidence document is classified as 'unknown', reducing reliability of the extracted data

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradictory

Baseline

Project-specific, modelled, reassessment not stated

Safeguards

No FPIC, no grievance mechanism, no safeguards

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0022

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents