COMPOSTING OF ORGANIC WASTE PROJECT IN GUANGXI
Score Breakdown
Integrity
verified The validation/verification process confirms additionality using an investment test (VVB: Applus+).
missing Leakage treatment is missing (monitoring documentation does not address leakage and no deduction is reported).
Transparency
verified Key MRV basics are present, including a defined monitoring period (2020-01-06 to 2022-12-31) and a verified total of 1,417,023 tCO2e.
missing The extracted record lacks the claimed ERs and does not provide leakage deduction details, limiting cross-checking.
Claim Safety
verified Verified ERs are reported for the monitoring period, reducing reliance on ex-ante estimates.
missing CORSIA and CCP status are not stated in available documents, and leakage is not addressed—both elevate greenwashing/over-crediting risk.
Documentation
verified A relatively complete document set is referenced (PDD, validation report, monitoring report, issuance) with high extraction confidence across 13 documents.
missing Corrective actions indicate documentation and calculation weaknesses that should have been resolved and clearly evidenced.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was assessed via an investment test and confirmed by the VVB (Applus+), which supports additionality robustness. The monitoring report (dated 2024-02-07) reports no material findings, but it also lists corrective actions related to insufficient documentation, monitoring plan/methodology conformity, and calculation assumptions that could affect credited volumes. Leakage is a key gap: the monitoring documentation does not address leakage and no leakage deduction is reported in the extracted record, weakening integrity for an organic waste diversion/composting activity where upstream/downstream effects can be relevant. Baseline setting is project-specific and the timing of any baseline reassessment is not stated in available documents.
Transparency
The monitoring period is clearly stated (2020-01-06 to 2022-12-31) and the monitoring report provides a verified total of 1,417,023 tCO2e, which supports traceability of issued outcomes. The VVB is identified (Applus+), and the methodology is specified (ACM0022 v03.0). However, the extracted record does not include the total emission reductions claimed, preventing a direct claimed-versus-verified comparison. Leakage treatment details (deduction percentage and justification) are also missing, limiting the ability to independently assess conservativeness.
Claim Safety
Because the project reports verified ERs for the monitoring period (monitoring report dated 2024-02-07), claims can be anchored to ex-post results rather than purely ex-ante projections. That said, leakage is not addressed and no deduction is reported in the extracted record, which increases over-crediting risk for public claims. In addition, CORSIA eligibility and CCP status are not stated in available documents, so buyers cannot easily assess whether the credits may be used across multiple claim channels or meet higher-integrity labels. The presence of corrective actions tied to calculations and evidence sufficiency further elevates claim risk until clearly resolved.
Documentation
The extracted record references a reasonably complete set of core documents (PDD, validation report, monitoring report, issuance) and indicates 13 documents were used with high extraction confidence, supporting document completeness. The monitoring report is recent (2024-02-07) relative to the monitoring period and crediting period start, which helps recency. However, the corrective actions listed indicate that, at least at the time of assessment, documentation and evidence were not fully sufficient and that calculation/application issues could affect ER quantities. Some important fields remain absent from the extracted record (e.g., claimed ERs, leakage deduction, baseline reassessment timing), reducing documentation strength.
Overall
No contradictions were identified in the extracted record, so scores are not reduced for inter-document inconsistencies. The project benefits from VVB-confirmed additionality and a clearly defined monitoring period with a large verified ER total, supporting moderate confidence. The main drivers pulling the overall score down are the absence of leakage treatment in the extracted record and the presence of corrective actions that explicitly relate to monitoring/methodology conformity and calculation assumptions affecting credited volumes. Note: if documentation were to score below 3.0, transparency would be capped post-scoring; and if integrity were below 4.0, the overall would be capped at 6.0 post-scoring.
Audit Analysis
This VCS composting project has VVB-confirmed additionality (investment test) and a recent monitoring period with verified emission reductions reported. However, leakage is not addressed in the extracted record and several corrective actions were required, which increases uncertainty around MRV rigor and over-crediting risk.
Project Description
The first issued indrect soil Soil carbon sequestration project in China The first composting project in China registered using the ACM0022 methodology Soil Carbon Sequestration. The organic wastes in this project are turned to fertilizer and are used for soil application by local farmers. The replacement of chemistry fertilizer with organic fertilizers can significantly increase the total organic carbon content of the soil, improve the physical and chemical properties of the soil, and give the soil a better ecological environment. Brief Introduction of the Project: The is a new composting plant which is designed to treat organic wastes that would otherwise have been dumped in the solid waste disposal sites to produce organic fertilizer. The project mainly comprises of fermentation system and fertilizer production system, and each has some subprocesses. The project is located in two sites, i.e instance 1 and instance 2. The instances 1 is designed to treat 400,000 tonnes wet organic waste per year and produce 300,000 tonnes fertilizer per year. The instances 2 is designed to treat 150,000 tonnes wet organic waste per year and produce 110,000 tonnes fertilizer per year.
Red Flags
- Leakage is explicitly not addressed in the monitoring documentation, and no leakage deduction is reported.
- Corrective actions were required related to insufficient documentation, monitoring plan/methodology conformity, and calculation assumptions affecting the quantity of emission reductions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 100,000 | 7,810 | 92,190 | |
| Total | 100,000 | 7,810 | 92,190 |
Cosa migliorerebbe questo punteggio
- Provide explicit leakage assessment and, if applicable, a quantified leakage deduction with clear justification in the monitoring/verification documentation.
- Disclose the total ERs claimed alongside the verified ERs and document closure of the listed corrective actions with evidence trails (data sources, calculation checks, and monitoring plan conformity).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test confirmed by VVB
Avoidance project but reversal/buffer not evidenced
Leakage not addressed; no deduction evidenced
Project-specific baseline; reassessment timing unclear
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →