Yixian MSW Incineration and Power Generation Project
#416of 1329 in Industrial#542of 1084 in China#633of 1339 in Verra (VCS)#8of 31 in ACM0022
Audit Analysis
The Yixian MSW Incineration project has a VVB-confirmed combined additionality test and is an avoidance-type project with no non-permanence risk, but it relies on a project-specific modeled baseline, a 0% leakage deduction justified only as 'deemed negligible,' and lacks a buffer pool. The absence of any monitoring report and the low extraction confidence across the document set limit confidence in both transparency and documentation quality.
Red Flags
- Leakage deduction of 0% justified solely as 'deemed negligible' without quantified analysis, which is a weak basis for an MSW incineration project where waste diversion to alternative facilities is a plausible leakage pathway
- No monitoring report found in the extracted record; the only performance figure (1,138,916 tCO₂e) is the ex-ante validation estimate, so actual delivery cannot be assessed
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific modeled baseline
FPIC, grievance mechanism, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →