Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalIndia Registry: RegisteredACM0022

Waste Energy project in Dadra & Nagar Haveli(D&NH)

VCS-2763 ↗

#170of 975 in India#164of 1339 in Verra (VCS)#1of 31 in ACM0022

6.1/ 10
Integrity
6.2
Transparency
5.8
Claim Safety
6.3
Documentation
5.8

Audit Analysis

A registered VCS waste-to-energy project in Dadra & Nagar Haveli with a VVB-confirmed investment additionality test and a conservative verified ERR that is only about 17% of the pro-rata lifetime expectation. However, the project-specific modeled baseline, a 0% leakage deduction justified only as 'deemed negligible,' and the absence of a stated buffer pool or FNRB value leave meaningful gaps in the integrity and claim-safety picture. Eight corrective action requests were raised and closed during validation/verification, and no open corrective actions remain.

Red Flags

  • Leakage deduction of 0% with only a 'deemed negligible' justification — no quantitative analysis or scenario comparison provided in the extracted record
  • FNRB value and usage monitoring method are not stated in any available document, leaving the energy accounting chain incomplete
  • Large discrepancy between the PDD ex-ante estimate (709,576 tCO₂e) and the validation report figure (21,769 tCO₂e) — likely different bases (lifetime vs. single monitoring period) but the extraction does not make this explicit

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversals deemed N/A

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific modeled baseline

Safeguards

Grievance & benefits sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0022

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents