Waste Energy project in Dadra & Nagar Haveli(D&NH)
#170of 975 in India#164of 1339 in Verra (VCS)#1of 31 in ACM0022
Audit Analysis
A registered VCS waste-to-energy project in Dadra & Nagar Haveli with a VVB-confirmed investment additionality test and a conservative verified ERR that is only about 17% of the pro-rata lifetime expectation. However, the project-specific modeled baseline, a 0% leakage deduction justified only as 'deemed negligible,' and the absence of a stated buffer pool or FNRB value leave meaningful gaps in the integrity and claim-safety picture. Eight corrective action requests were raised and closed during validation/verification, and no open corrective actions remain.
Red Flags
- Leakage deduction of 0% with only a 'deemed negligible' justification — no quantitative analysis or scenario comparison provided in the extracted record
- FNRB value and usage monitoring method are not stated in any available document, leaving the energy accounting chain incomplete
- Large discrepancy between the PDD ex-ante estimate (709,576 tCO₂e) and the validation report figure (21,769 tCO₂e) — likely different bases (lifetime vs. single monitoring period) but the extraction does not make this explicit
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
reversals deemed N/A
0% deduction, 'deemed negligible' only
Project-specific modeled baseline
Grievance & benefits sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →