CBG GENERATION FROM MSW
#299of 387 in India#479of 629 in Verra (VCS)#5of 6 in ACM0022
Audit Analysis
A CBG-from-MSW energy project in India with VVB-confirmed additionality and a plausible zero-leakage claim, but undermined by a project-specific baseline, absence of FPIC, 24 material findings during validation, and no monitoring data yet available. The low extraction confidence and timing discrepancy between the 2022 crediting start and 2025 validation report further weaken confidence in the documentation record.
Red Flags
- 24 material findings in the validation report indicate extensive initial documentation and methodology gaps, including unresolved questions on installed capacity (200 vs 500 TPD), additionality tool selection, and zero-leakage justification
- FPIC was not conducted despite the project operating in a community context (municipal waste collection in India)
- Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified
- Crediting period began in May 2022 but the validation report is dated May 2025, raising questions about the project's operational status during the interim
- Low extraction confidence across the document set limits reliability of the extracted data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but test-type contradiction between report ver
Energy project; non-performance risk analysis not applicable
0% deduction justified as quantified; PDD wording inconsiste
Project-specific modeled baseline; reassessment not yet due
Grievance mechanism present; FPIC not conducted; benefit sha
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →