Solid Waste Management Project at Moradabad
#397of 1329 in Industrial#497of 975 in India#623of 1339 in Verra (VCS)#7of 31 in ACM0022
Audit Analysis
The Moradabad solid waste management project (VCS-3282, ACM0022) has a VVB-confirmed investment additionality test and a registered status, but is undermined by a project-specific modeled baseline, a 0% leakage deduction justified only as 'deemed negligible,' and eight material findings that required corrections to baseline logic and ex-ante emission estimates. The verified ERR for the 1.5-year monitoring period (25,082 tCO₂e) represents only about 20% of the pro-rata expectation derived from the PDD's lifetime ex-ante estimate, indicating significant under-delivery relative to the original claim. Multiple data gaps (CORSIA/CCP status, FNRB method, usage monitoring) and a 34% discrepancy between two verification reports on the same ERR figure reduce confidence in the project's data integrity.
Red Flags
- Two verification reports (May 2024 and July 2024) report materially different verified ERR figures (38,388 vs 25,082 tCO₂e) for what appears to be the same monitoring period, a 34% discrepancy that undermines data reliability
- The PDD ex-ante lifetime estimate (823,361 tCO₂e) is 57% higher than the figure in the May 2024 verification report (525,106 tCO₂e), suggesting the original claim was significantly overstated
- Leakage deduction is 0% with only a 'deemed negligible' justification; the material findings note compost is used for soil application, but no quantitative leakage analysis is provided
- Eight corrective action requests (CAR 01–08) were raised in the verification report, covering missing metering calibration certificates, missing no-double-accounting declaration, missing grievance register, and missing supporting documents for GHG calculations, yet the corrective_actions_required field is empty in the extracted record
- CORSIA eligibility and CCP status are both not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 3,215 | 186 | 3,029 | |
| 2021 | 15,089 | 50 | 15,039 | |
| 2022 | 20,084 | 0 | 20,084 | |
| Total | 38,388 | 236 | 38,152 |
Risk Indicators
VVB-confirmed investment test
reversal stated N/A
0% deduction, weak justification
Project-specific, modeled, not yet due for reassessment
Grievance mechanism present; FPIC not stated; CAR on grievance register
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →