Skip to main content
GSBiomass, or Liquid Biofuel - CogenerationTurkeyACM0022

IBB Biomethanation Plant Project

GS-1966 ↗ · current registry ID: GS7528

#192of 352 in Biomass#265of 295 in Turkey#1406of 1801 in Gold Standard (GS)#19of 31 in ACM0022

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The IBB Biomethanation Plant in Turkey is a Gold Standard biomass project with VVB-confirmed additionality, but it is undermined by extensive data contradictions across documents, a significant capacity shortfall (operating at ~18% of design), and a verified ER that covers only about 18% of the pro-rata ex-ante expectation for the elapsed monitoring period. The project is under-crediting rather than over-crediting, which mitigates greenwashing risk, but the unrealistic ex-ante estimates and numerous unresolved corrections raise questions about the robustness of the underlying methodology application.

Red Flags

  • Verified ER of 25,482 tCO2e covers only ~18% of the pro-rata ex-ante expectation (~140,535 tCO2e) for the 2.2-year monitoring period within the 5-year crediting period, indicating the ex-ante estimates were significantly over-optimistic
  • Material finding CAR-02 documents a discrepancy between stated waste/biogas capacity (437.5 t / 12,000 m³) and actual operation (80 t / 4,800 m³), meaning the plant operates at roughly 18% of design capacity
  • Three different grid emission factor values appear across documents (0.4458, 0.5403, 0.5706 tCO2/MWh), creating uncertainty in the ER calculation basis
  • 25+ corrective actions remain open in the verification report, including errors in ER calculation sheets, missing monitoring parameters, and inconsistent PDD references

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Technology-based, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific, modeled, not jurisdictional

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-11ACM0022

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents