IBB Biomethanation Plant Project
GS-1966 ↗ · current registry ID: GS7528
#192of 352 in Biomass#265of 295 in Turkey#1406of 1801 in Gold Standard (GS)#19of 31 in ACM0022
Audit Analysis
The IBB Biomethanation Plant in Turkey is a Gold Standard biomass project with VVB-confirmed additionality, but it is undermined by extensive data contradictions across documents, a significant capacity shortfall (operating at ~18% of design), and a verified ER that covers only about 18% of the pro-rata ex-ante expectation for the elapsed monitoring period. The project is under-crediting rather than over-crediting, which mitigates greenwashing risk, but the unrealistic ex-ante estimates and numerous unresolved corrections raise questions about the robustness of the underlying methodology application.
Red Flags
- Verified ER of 25,482 tCO2e covers only ~18% of the pro-rata ex-ante expectation (~140,535 tCO2e) for the 2.2-year monitoring period within the 5-year crediting period, indicating the ex-ante estimates were significantly over-optimistic
- Material finding CAR-02 documents a discrepancy between stated waste/biogas capacity (437.5 t / 12,000 m³) and actual operation (80 t / 4,800 m³), meaning the plant operates at roughly 18% of design capacity
- Three different grid emission factor values appear across documents (0.4458, 0.5403, 0.5706 tCO2/MWh), creating uncertainty in the ER calculation basis
- 25+ corrective actions remain open in the verification report, including errors in ER calculation sheets, missing monitoring parameters, and inconsistent PDD references
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed combined test
Technology-based, no reversal risk
0% deduction, justification inconsistent across docs
Project-specific, modeled, not jurisdictional
Grievance mechanism present, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →