Guangzhou Eastern Solid Resource Recycling Center MSW Integrated treatment Plant Project

VCS-2746 ↗

#154of 209 in China#474of 632 in Verra (VCS)#3of 6 in ACM0022

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

A registered VCS waste-to-energy project (ACM0022) with VVB-confirmed additionality and an approved operational deviation, but significant concerns arise from a 6.75× over-delivery relative to the pro-rata lifetime expectation, a grid emission factor contradiction between the PDD and monitoring report, a 0% leakage deduction with inconsistent justification, and seven cross-document contradictions that undermine data reliability.

Red Flags

  • Verified ERR of 320,811 tCO2e for the 2023 monitoring period is approximately 6.75× the pro-rata expectation of ~47,508 tCO2e derived from the 332,556 tCO2e lifetime claim over the 7-year crediting period, raising serious over-crediting concerns.
  • Grid emission factor contradiction: the PDD records 0.50885 tCO2/kWh (2019) while the monitoring report uses 0.8042 tCO2/kWh — a 58% higher value that directly inflates the verified ERR.
  • Leakage deduction is 0% with the verification report stating the issue was 'not addressed' while the monitoring report claims it was 'deemed negligible' — no quantified assessment or consistent justification is provided.
  • Seven contradictions across documents (FPIC, additionality test type, grid EF, grievance mechanism, benefit sharing, leakage justification, safeguards) indicate significant data reliability issues.
  • Corrective actions required for gas generator model mismatch and flow meter serial number discrepancy between calibration certificates and on-site nameplates.

Credit Vintages

IssuedRetiredAvailable
2020
113,50754,97858,529
2021
219,04927,943191,106
2022
170,0003,316166,684
Total502,55686,237416,319

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool or reversal data stated

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, modeled, no reassessment stated

Safeguards

Confirmed by VVB but contradicted in PDD

Double-claim

CORSIA excluded; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0022

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents