Guangzhou Eastern Solid Resource Recycling Center MSW Integrated treatment Plant Project
#154of 209 in China#474of 632 in Verra (VCS)#3of 6 in ACM0022
Audit Analysis
A registered VCS waste-to-energy project (ACM0022) with VVB-confirmed additionality and an approved operational deviation, but significant concerns arise from a 6.75× over-delivery relative to the pro-rata lifetime expectation, a grid emission factor contradiction between the PDD and monitoring report, a 0% leakage deduction with inconsistent justification, and seven cross-document contradictions that undermine data reliability.
Red Flags
- Verified ERR of 320,811 tCO2e for the 2023 monitoring period is approximately 6.75× the pro-rata expectation of ~47,508 tCO2e derived from the 332,556 tCO2e lifetime claim over the 7-year crediting period, raising serious over-crediting concerns.
- Grid emission factor contradiction: the PDD records 0.50885 tCO2/kWh (2019) while the monitoring report uses 0.8042 tCO2/kWh — a 58% higher value that directly inflates the verified ERR.
- Leakage deduction is 0% with the verification report stating the issue was 'not addressed' while the monitoring report claims it was 'deemed negligible' — no quantified assessment or consistent justification is provided.
- Seven contradictions across documents (FPIC, additionality test type, grid EF, grievance mechanism, benefit sharing, leakage justification, safeguards) indicate significant data reliability issues.
- Corrective actions required for gas generator model mismatch and flow meter serial number discrepancy between calibration certificates and on-site nameplates.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 113,507 | 54,978 | 58,529 | |
| 2021 | 219,049 | 27,943 | 191,106 | |
| 2022 | 170,000 | 3,316 | 166,684 | |
| Total | 502,556 | 86,237 | 416,319 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal data stated
0% deduction, inconsistent justification
Project-specific, modeled, no reassessment stated
Confirmed by VVB but contradicted in PDD
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →