Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AMS-III.BC — Emission reductions through improved efficiency of vehicle fleets

About this methodology

Projects improve vehicle fleet efficiency through equipment or operating changes. The method measures emissions avoided by using less fuel for the transport service.

Version
3.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Transport
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Figures set against the methodology's own values

  • Integrity comparison

    The small-scale limit is 60 kt CO2e per year (p. 6). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-BC-SMALL-SCALE-LIMIT

    small-scale limit: 60 kt CO2e per year

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-BC-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v03.0adopted 8 Sept 2022source

    Ensure the consistency in definitions of market penetration metrics and thresholds. 12 Considering the uncertainties related to for example data collection on parameters via control groups.

  • v02.0adopted 4 Oct 2013source

    Include engine efficiency retrofits to vehicles that improves combustion efficiency; Update the provision related to PoA.

  • v01.0adopted 20 Jul 2012source

    Initial adoption.

Projects using AMS-III.BC

Browse 3 published projects using AMS-III.BC, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.BC?

In CarbonMeld's data, AMS-III.BC projects are on 2 registries: American Carbon Registry (2) and Verra (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
American Carbon Registry (ACR)20See the list
Verra (VCS)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database