Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0077-GRID-EF
AM0077 — Recovery of gas from oil wells that would otherwise be vented or flared and its delivery to specific end-users
About this methodology
Projects recover gas from oil wells that would otherwise be flared or vented and deliver processed gas to identified users or a pipeline. The method measures changes in gas-disposal and fuel-use emissions, accounting for processing and transport.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Fugitive emissions
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it (AM0077 v01 Leakage, p. 13). CarbonMeld reads it in the project's documents. CM-F-AM0077-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Tracking of the end use: the methodology sets rules for it (AM0077 v01 applicability, p. 2). Our current method does not assess it. CM-F-AM0077-END-USE-TRACKING
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0077-SAFEGUARDS-FPIC
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using AM0077
Browse 1 published project using AM0077, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0077?
In CarbonMeld's data, AM0077 projects are on one registry: CDM (1 project, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: Not registered