Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AM0070 — Manufacturing of energy efficient domestic refrigerators

About this methodology

Projects manufacture refrigerators that use less electricity in households. The method measures emissions avoided through lower electricity consumption during their use.

Version
3.1.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Appliances
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • Integrity shown

    Additionality: the methodology itself gives it (AM0070 v03.1.0, p. 3). The project needs no test of its own. CM-F-AM0070-ADDITIONALITY

    Link
  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0070-GRID-EF

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0070-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

All 4 versions
  • v03.1.0adopted 26 Nov 2010source

    Include an option to calculate the market benchmark based on data from a national labelling scheme where such a labelling scheme exists and where labelled refrigerators are the most efficient refrigerators in the host country.

  • v03adopted 26 Mar 2010source

    Include one more option for the required evidences to ensure that produced refrigerators are not exported (i.e. VAT documentation); Adjust the baseline emissions procedure in order to account for changes in time in the national standards …

  • v02adopted 16 Oct 2009source

    Clarify: Criteria for Assessing Additionality; Procedures to calculate ATDmarket; Meaning of “Buyer”; Inclusion of two missing parameters in the monitoring table.

  • v01adopted 26 Sept 2008source

    Initial adoption.

Projects using AM0070

Browse 3 published projects using AM0070, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AM0070?

In CarbonMeld's data, AM0070 projects are on 2 registries: CDM (2) and Verra (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)22See the list
Verra (VCS)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.