Grid emission factor: the methodology sets rules for it (AM0059 v02.0 project / baseline electricity, p. 14). CarbonMeld reads it in the project's documents. CM-F-AM0059-GRID-EF
AM0059 — Reduction in GHGs emission from primary aluminium smelters
About this methodology
Projects improve aluminium smelting technology to reduce perfluorocarbon releases or electricity consumption. The method measures the greenhouse gas reductions from those improvements.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Aluminium
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it in some cases (AM0059 v02.0 Leakage para 53, p. 16). CarbonMeld reads it in the project's documents. CM-F-AM0059-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-AM0059-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0059-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v02.0adopted 22 Jul 2016source
Include the requirements of TOOL05 and TOOL08.
-
v01.1adopted 16 May 2008source
“Tool to calculate baseline, project and/or leakage emissions from electricity consumption” replaces the withdrawn “Tool to calculate project emissions from electricity consumption”.
-
v01.0adopted 19 Oct 2007source
Initial adoption.
Projects using AM0059
Browse 5 published projects using AM0059, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0059?
In CarbonMeld's data, AM0059 projects are on 2 registries: CDM (4) and Verra (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 4 | 4 | See the list |
| Verra (VCS) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending