Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

GS-AR — Afforestation – reforestation GHG emissions reductions & sequestration methodology

About this methodology

Projects plant trees on land that does not meet the definition of a forest, including agroforestry and silvopasture. The method measures net CO2 removal from growing carbon stocks against the land use that would otherwise continue.

Version
2.1 · source ·
Climate outcome
CO2 removals
Activity
Forestry
Official page
globalgoals.goldstandard.org ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Buffer pool: the methodology sets rules for it (GS Product Requirements v3.0 §11.1.1, p. 15). CarbonMeld reads it in the project's documents. CM-F-GS-AR-BUFFER

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

  • Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED

    Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

  • Where carbon is stored: the permanence start P-START

    CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.

    Forests: CCQI's grade of the programme.

Figures set against the methodology's own values

  • Integrity comparison

    The buffer share is 20% (from GS Product Requirements v3.0; GS Product Requirements v3.0, §11.1.1, p. 15). CarbonMeld shows the share in the documents next to it. CM-F-GS-AR-BUFFER-SHARE

    buffer share: 20% · from GS Product Requirements v3.0 · source: GS Product Requirements v3.0, §11.1.1, p. 15

    Link
  • Integrity comparison

    The crediting period is 30–50 years (GS LUF Activity Requirements v1.1, §6.2(a), p. 15). CarbonMeld compares the length of the period with it. CM-F-GS-AR-CREDITING-LENGTH

    crediting period: 30–50 years · source: GS LUF Activity Requirements v1.1, §6.2(a), p. 15

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    No legal requirement for the activity: the methodology sets rules for it (GS A/R Methodology v2.1 §3.2.2, p. 6). Our current method does not assess it. CM-F-GS-AR-REGULATORY-SURPLUS

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): the methodology sets rules for it (GS LUF Activity Requirements v1.1 §4.1, p. 13). Our current method does not assess it. CM-F-GS-AR-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v2.1released 16 May 2024currentsource

    ¾ Minor Updates ¾ Further details on demonstration of additionality. ¾ Further clarity on accounting of baseline removals ¾ Editorial corrections

  • v2.0released 26 Oct 2022source

    ¾ New Methodology template. ¾ Clarity on mangroves, soil carbon pool. ¾ References updated. ¾ Rule update/ clarification included. ¾ Other editorial changes.

  • v1.0released 3 Jul 2017source

    First version

Top projects using GS-AR

This page ranks projects using GS-AR by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.

9 rated projects of the 31 tracked in this methodology · average rating 3.6/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety.

13 analysed project pages, A–Z →

Which registries list projects under GS-AR?

In CarbonMeld's data, GS-AR projects are on one registry: Gold Standard (31 projects, 19 registered).

RegistryProjectsRegisteredProjects list
Gold Standard (GS)3119See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

#1 VICHADA CLIMATE REFORESTATION PROJECT (PAZ) GS Colombia ARR (afforestation) Registry: Registered 3.9/10 #2 Markham Valley A/R Project GS Papua New Guinea ARR (afforestation) Registry: Registered 3.7/10 #3 Sustainable cocoa plantation system (agroforestry) in East Nicaragua GS Nicaragua ARR (afforestation) Registry: Registered 3.7/10
  1. 4
    Conservation and reforestation of degraded areas in Barbosa, Colombia GS Colombia ARR (afforestation) Registry: Registered
    3.7
  2. 5
    Afforestation with Hazelnut Plantations in Western Georgia GS Georgia ARR (afforestation) Registry: Registered
    3.7
  3. 6
    Australian Yarra Yarra Biodiversity Project GS Australia ARR (afforestation) Registry: Registered
    3.5
  4. 7 3.5
  5. 8 3.5
  6. 9
    JOil Jatropha plantation in Ghana GS Ghana ARR (afforestation) Registry: Registered
    3.5

← All leaderboards · Full database