Afforestation on the Big Island of Hawaii: Restoring native hardwood forests and enhancing multiple ecosystem services
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reports no material findings or corrective actions.
missing Leakage treatment, buffer pool coverage, and reversal-event detail are not stated in the available documents.
Transparency
verified The project has a named verifier, Pangolin Associates, and a defined monitoring period for 2022.
missing Key MRV details such as total credits claimed versus verified, leakage treatment, and usage monitoring are not stated in the extracted record.
Claim Safety
verified The project uses a Gold Standard afforestation/reforestation methodology and the baseline was last reassessed in 2012.
missing No quantified leakage deduction, FNRB value, or usage-rate evidence is available, leaving over-crediting risk only partially assessed.
Documentation
verified Six documents were used, including the PDD and verification report, and extraction confidence is high.
missing The record still lacks several important fields, including buffer pool, leakage, and CORSIA/CCP status.
Detailed Analysis
Integrity
The verification report confirms additionality through a combined test and says the VVB found no material findings or required corrective actions. That supports the project’s core integrity case. Still, leakage treatment is not stated, buffer pool coverage is not found in the extracted record, and reversal handling is marked as not addressed, which weakens permanence and leakage confidence.
Transparency
Transparency is moderate because the verifier is named as Pangolin Associates and the monitoring period is clearly stated as 2022. However, the extracted record does not state total credits claimed versus verified, usage monitoring method, or leakage treatment, so the public MRV picture is incomplete. The documentation is readable and multi-sourced, but key quantitative fields are missing.
Claim Safety
Claim safety is middling. The project uses a Gold Standard afforestation/reforestation methodology and the baseline was last reassessed in 2012, which is helpful, but the baseline is project-based rather than clearly standardized or jurisdictional. Because leakage deduction, FNRB, and usage-rate evidence are not stated, the risk of over-crediting cannot be tightly bounded.
Documentation
Documentation quality is fair to good: six documents were used, including the PDD, verification report, and appendix, and extraction confidence is high. The crediting period is long and the monitoring period is recent, which helps, but several important fields remain absent from the extracted record. No corrective actions were required, which is a positive sign, but the evidence set is still incomplete for a high-confidence assessment.
Overall
There are no contradictions listed in the extracted record, so no document-priority resolution was needed. I privileged the verification report for additionality and findings because it is the most relevant assurance document, and it supports the score upward. The main limitation is missing evidence on leakage, buffer pool, reversal handling, and double-claim status, which keeps the overall score in the moderate range rather than high.
Audit Analysis
This is a forestry afforestation project with VVB-confirmed additionality and no material findings in the verification report, which supports a moderate-to-strong integrity profile. However, several key risk controls are not stated in the extracted record, especially leakage treatment, buffer pool coverage, and reversal handling, which limits confidence in permanence and over-crediting risk.
Project Description
Developer: HLH Type: A/R Size: Small Scale Crediting period: 2014-06-09 → 2019-06-09 Estimated annual credits: 10000 tCO2e SDGs: Goal 13: Climate Action, Goal 15: Life On Land, Goal 12: Responsible Production and Consumption
Red Flags
- Leakage treatment is not stated, and no leakage deduction is reported in the extracted record.
- Permanence controls are incomplete in the extracted record because buffer pool coverage and reversal-event handling are not stated.
- Leakage not addressed in project documentation
- Buffer pool size not disclosed in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 174 | 0 | 174 | |
| 2017 | 814 | 400 | 414 | |
| 2018 | 4,490 | 400 | 4,090 | |
| 2019 | 2,533 | 0 | 2,533 | |
| 2020 | 1,251 | 0 | 1,251 | |
| 2021 | 1,497 | 0 | 1,497 | |
| 2022 | 1,732 | 0 | 1,732 | |
| 2023 | 1,894 | 0 | 1,894 | |
| 2024 | 1,998 | 0 | 1,998 | |
| 2025 | 2,139 | 0 | 2,139 | |
| 2026 | 2,397 | 0 | 2,397 | |
| 2027 | 2,518 | 0 | 2,518 | |
| 2028 | 2,658 | 0 | 2,658 | |
| 2029 | 2,569 | 0 | 2,569 | |
| 2030 | 2,701 | 0 | 2,701 | |
| 2031 | 2,731 | 0 | 2,731 | |
| 2032 | 2,485 | 0 | 2,485 | |
| 2033 | 2,277 | 0 | 2,277 | |
| 2034 | 2,025 | 0 | 2,025 | |
| 2035 | 1,994 | 0 | 1,994 | |
| 2036 | 1,931 | 0 | 1,931 | |
| 2037 | 1,848 | 0 | 1,848 | |
| 2038 | 1,616 | 0 | 1,616 | |
| 2039 | 1,666 | 0 | 1,666 | |
| 2040 | 1,577 | 0 | 1,577 | |
| 2041 | 1,447 | 0 | 1,447 | |
| 2042 | 1,566 | 0 | 1,566 | |
| 2043 | 1,524 | 0 | 1,524 | |
| 2044 | 1,615 | 0 | 1,615 | |
| 2045 | 1,656 | 0 | 1,656 | |
| 2046 | 1,758 | 0 | 1,758 | |
| 2047 | 1,649 | 0 | 1,649 | |
| 2048 | 1,771 | 0 | 1,771 | |
| 2049 | 1,611 | 0 | 1,611 | |
| 2050 | 1,406 | 0 | 1,406 | |
| 2051 | 1,499 | 0 | 1,499 | |
| 2052 | 1,393 | 0 | 1,393 | |
| 2053 | 1,401 | 0 | 1,401 | |
| 2054 | 1,336 | 0 | 1,336 | |
| 2055 | 1,514 | 0 | 1,514 | |
| 2056 | 1,380 | 0 | 1,380 | |
| 2057 | 1,252 | 0 | 1,252 | |
| 2058 | 1,090 | 0 | 1,090 | |
| 2059 | 1,010 | 0 | 1,010 | |
| Total | 79,393 | 800 | 78,593 |
Cosa migliorerebbe questo punteggio
- Provide quantified leakage treatment, buffer pool coverage, and reversal monitoring details in the public documentation.
- Disclose verified issuance figures, usage monitoring assumptions, and explicit CORSIA/CCP status to reduce double-claim and over-crediting uncertainty.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
buffer and reversal controls unclear
leakage not stated
project baseline with reassessment date
grievance and benefit-sharing present, FPIC not stated
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →