Australian Yarra Yarra Biodiversity Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test in the PDD.
missing The verification report lists many material findings and corrective actions, and leakage justification is marked as not addressed.
Transparency
verified The monitoring period is clearly stated for 2024, and the VVB is named as Pangolin Associates.
missing Claimed versus verified issuance cannot be reconciled because the extracted record does not include a claimed total, and several monitoring inputs are not stated.
Claim Safety
verified The project is an A/R project under Gold Standard with a compliance buffer of 20%, which helps reduce permanence risk.
missing Leakage and reversal handling are not consistently documented, and no CORSIA or CCP status is stated to reduce dual-claim uncertainty.
Documentation
verified Multiple official document types were used, including the monitoring report, PDD, verification report, and appendix.
missing The extraction confidence is only medium, and the record contains many unresolved fields plus several contradictions across documents.
Detailed Analysis
Integrity
The verification report confirms additionality by the VVB, and the project uses a combined additionality test in the PDD, which supports the baseline case. On the other hand, the same verification report lists many material findings and corrective actions, and leakage justification is recorded as not addressed, which weakens confidence in the credited reductions. A 20% compliance buffer is a positive permanence feature, but the reversal treatment is not cleanly documented in the extracted record.
Transparency
The monitoring period for 2024 is clearly stated, and the VVB is identified as Pangolin Associates, which helps traceability. However, the extracted record does not provide a claimed issuance total, and several key monitoring inputs are not stated, including usage monitoring details and the relevant forest reference baseline inputs. Overall transparency is therefore only moderate.
Claim Safety
Claim safety is helped by the Gold Standard A/R methodology and the presence of a 20% buffer pool, which reduces some permanence risk. But the record leaves leakage treatment unresolved in the verification report, and the project’s CORSIA and CCP status are not stated, so dual-claim and over-crediting risk cannot be ruled out cleanly. The absence of a recent baseline reassessment also limits confidence in the claim.
Documentation
The evidence set spans several official documents, including the monitoring report, PDD, verification report, and appendix, which is a positive sign. Still, the extraction confidence is only medium, and the record contains many unresolved fields such as leakage deduction, usage-rate monitoring, and forest reference baseline values. The large number of findings and corrective actions also suggests the documentation package required substantial follow-up.
Overall
I privileged the verification report for audit outcomes and the PDD for methodology details because they are the most specific sources in the extracted record. Where documents conflict, I treated the newer verification report as more relevant for current audit status, but I still discounted the score because the PDD and monitoring report disagree on benefit sharing, leakage treatment, reversal handling, and the crediting period start. These contradictions indicate reliability issues, so the overall score is held down despite some positive signals.
Audit Analysis
This project has some positive integrity signals, including VVB-confirmed additionality, a 20% compliance buffer, and no reversal event clearly documented in the extracted record. However, the record also shows many material findings and corrective actions, plus several unresolved gaps on leakage, baseline reassessment, and reversal treatment, which weakens confidence in the credited volume. The documentation is moderate rather than strong because the evidence set is incomplete in key places and one contradiction set suggests the record is not fully consistent across documents.
Project Description
Developer: Carbon Neutral Type: A/R Size: Large Scale Crediting period: 2015-06-11 → 2058-06-11 Estimated annual credits: 25151 tCO2e SDGs: Goal 15: Life On Land, Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action
Red Flags
- A large number of material findings and corrective actions were recorded in the verification report, which raises implementation and audit-quality concerns.
- Leakage treatment is not clearly justified in the verification report, and reversal treatment is inconsistently described across documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 2,808 | 2,808 | 0 | |
| 2010 | 9,355 | 9,355 | 0 | |
| 2011 | 15,952 | 15,952 | 0 | |
| 2012 | 21,738 | 21,738 | 0 | |
| 2013 | 24,914 | 15,151 | 9,763 | |
| 2014 | 47,528 | 22,026 | 25,502 | |
| 2015 | 32,672 | 4,258 | 28,414 | |
| 2016 | 37,522 | 4,288 | 33,234 | |
| 2017 | 66,908 | 66,695 | 213 | |
| 2018 | 42,946 | 4,456 | 38,490 | |
| 2019 | 45,584 | 16,048 | 29,536 | |
| 2020 | 48,329 | 10,643 | 37,686 | |
| 2021 | 20,000 | 0 | 20,000 | |
| 2022 | 20,000 | 0 | 20,000 | |
| 2024 | 10,000 | 0 | 10,000 | |
| 2025 | 7,500 | 0 | 7,500 | |
| 2026 | 5,000 | 0 | 5,000 | |
| Total | 458,756 | 193,418 | 265,338 |
Cosa migliorerebbe questo punteggio
- Provide a clear, reconciled statement on leakage treatment, reversal events, and buffer use across the monitoring report, verification report, and PDD.
- Publish a complete issuance reconciliation and update the record with explicit CORSIA/CCP status, baseline reassessment timing, and quantified monitoring inputs.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
buffer present, reversal treatment unclear
leakage not clearly justified
project baseline, reassessment missing
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring - GS 3039 - 2021 Certification - v 151121(clean)(1).pdf
- PerfCert_v3.0-Project-Annual-Report_2024.pdf
- Sustainability Monitoring Plan - Auscarbon - All Areas - 010618.pdf
- 1810_05 GS 3039 Auscarbon_Audit_Report_FINAL_v1.0_06Oct2018 (2).pdf
- Auscarbon GS Perform Cert FINAL 18April16.pdf
- Project-Design-Document-GS3039-2021 Certification v151121(clean)(1).pdf
- +1 more
Other
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →