Skip to main content
GSA/RPapua New GuineaGeneral Methodologyv2.1

Markham Valley A/R Project

GS-1735 ↗ · current registry ID: GS6503

#108of 352 in Biomass#858of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Markham Valley A/R project in Papua New Guinea is a Gold Standard afforestation/forestation project with VVB-verified additionality and a 20% buffer pool, but it carries significant unresolved issues including 14 corrective actions, 3 open grievances, a pending design change (repurposing from rotational to conservation forestry), and a shift in leakage treatment from quantified to deemed negligible. The project-specific baseline, absence of a stated reassessment date, and contradictory ERR figures across documents introduce material uncertainty about the robustness of the claimed reductions.

Red Flags

  • 14 corrective actions remain open, including clarification of the basis for skipping the investment analysis in the additionality tool and a discrepancy between site-visit measurements and the project proponent's inventory data
  • Leakage treatment shifted from 'quantified' in the 2020 validation report to 'deemed negligible' in the 2025 verification report with a 0% deduction, a material weakening of the leakage safeguard for an A/R project in a logging-active region
  • 3 unresolved grievances (maintenance, payment timing, CEPA permit update) remain open per the verification report
  • Design change repurposing the project from rotational to conservation forestry is still awaiting SustainCert approval, meaning the current methodology basis is in flux
  • ERR figures contradict across documents: 93,554 (monitoring report, Dec 2025) vs 112,912 (appendix, May 2024), a ~17% discrepancy unexplained in the extracted record

Credit Vintages

IssuedRetiredAvailable
2020
3,92003,920
2021
37,675037,675
2022
45,043045,043
2023
30,305030,305
Total116,9430116,943

Risk Indicators

Additionality

VVB-verified but investment analysis skip questioned

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification weakened from quantified to negligible

Baseline

Project-specific, no reassessment date stated

Safeguards

FPIC and grievance mechanism present, 3 grievances unresolved

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents