Markham Valley A/R Project
GS-1735 ↗ · current registry ID: GS6503
#108of 352 in Biomass#858of 1801 in Gold Standard (GS)
Audit Analysis
The Markham Valley A/R project in Papua New Guinea is a Gold Standard afforestation/forestation project with VVB-verified additionality and a 20% buffer pool, but it carries significant unresolved issues including 14 corrective actions, 3 open grievances, a pending design change (repurposing from rotational to conservation forestry), and a shift in leakage treatment from quantified to deemed negligible. The project-specific baseline, absence of a stated reassessment date, and contradictory ERR figures across documents introduce material uncertainty about the robustness of the claimed reductions.
Red Flags
- 14 corrective actions remain open, including clarification of the basis for skipping the investment analysis in the additionality tool and a discrepancy between site-visit measurements and the project proponent's inventory data
- Leakage treatment shifted from 'quantified' in the 2020 validation report to 'deemed negligible' in the 2025 verification report with a 0% deduction, a material weakening of the leakage safeguard for an A/R project in a logging-active region
- 3 unresolved grievances (maintenance, payment timing, CEPA permit update) remain open per the verification report
- Design change repurposing the project from rotational to conservation forestry is still awaiting SustainCert approval, meaning the current methodology basis is in flux
- ERR figures contradict across documents: 93,554 (monitoring report, Dec 2025) vs 112,912 (appendix, May 2024), a ~17% discrepancy unexplained in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 3,920 | 0 | 3,920 | |
| 2021 | 37,675 | 0 | 37,675 | |
| 2022 | 45,043 | 0 | 45,043 | |
| 2023 | 30,305 | 0 | 30,305 | |
| Total | 116,943 | 0 | 116,943 |
Risk Indicators
VVB-verified but investment analysis skip questioned
mixed evidence / unresolved risk
0% deduction, justification weakened from quantified to negligible
Project-specific, no reassessment date stated
FPIC and grievance mechanism present, 3 grievances unresolved
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →