JOil Jatropha plantation in Ghana

GS-3109 ↗ · current registry ID: GS11154

#15of 21 in Ghana#1080of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The JOil Jatropha plantation in Ghana is a Gold Standard A/R project with VVB-confirmed additionality and documented safeguards, but the verification report identified ten corrective action requests revealing systemic errors in the monitoring report, including an incorrect carbon fraction, wrong equations, and data inconsistencies. The project delivered roughly one-third of the pro-rata lifetime expectation for the 2022 monitoring period, a shortfall partly explained by severe drought (65–70% of normal rainfall) and the young age of the plantation. The absence of a stated buffer pool and the project-specific baseline leave meaningful permanence and baseline-validity gaps.

Red Flags

  • Ten corrective action requests in the 2022 verification report, including an incorrect carbon fraction (0.47 used instead of 0.5), incorrect tree-survival equations, missing biometric parameters, and a 20% discount erroneously applied to VERs — indicating systemic MRV quality problems.
  • No buffer pool percentage is stated in any available document, leaving the 30-year A/R project without a quantified permanence safeguard against reversal from fire, disease, or land-use change.
  • The project was not expanded as projected in the PDD due to drought, and rainfall in 2022 was only 65–70% of normal, raising questions about the robustness of the ex-ante sequestration projections.
  • Crediting-period start date differs between the PDD (2018-01-01) and the verification report (2018-06-07), a five-month discrepancy that affects the pro-rata calculation basis.

Credit Vintages

IssuedRetiredAvailable
2018
4,5193,615904
2019
7,9683,3434,625
2020
6,2651,0435,222
Total18,7528,00110,751

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

A/R reversal risk unquantified

Leakage

0% deduction, 'deemed negligible' — thin justification

Baseline

Project-specific baseline; reassessment not yet due

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents