Skip to main content
Rankings · methodology

Top AMS-III.E projects

7 rated projects in this methodology · average score 4.6/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.

← All leaderboards · Full database

#1Lages Methane Avoidance ProjectCDMBrazilBiomassRegistry: Registered6.1/10#2“Methane Avoidance by Municipal Solid Waste Processing in the city of Chandigarh, India”CDMIndiaMethaneRegistry: Registered4.5/10#3Galofer CHP with Rice HusksCDMUruguayBiomassRegistry: Registered4.4/10
  1. 4
    Inácio Martins Biomass ProjectCDMBrazilBiomassRegistry: Registered
    4.4
  2. 5
    Triplay Amazonico Methane Avoidance ProjectCDMPeruBiomassRegistry: Registered
    4.4
  3. 6
    ENCO Biomass Energy Plant in MalaysiaCDMMalaysiaBiomassRegistry: Registered
    4.3
  4. 7
    Lamdeng Waste to Energy Project, ManipurUCRIndiaOtherRegistry: status unavailable
    3.8

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.