verified The validation report dated 2024-08-07 confirms additionality through an investment test and says the VVB verified it.
missing Leakage justification is recorded as not addressed, and buffer pool coverage or reversal handling is not stated in the available documents.
Transparency
verified The validation report identifies the VVB as LGAI Technological Center S.A. (Applus+ Certification) and gives a clear monitoring period from 2021-11-15 to 2028-11-14.
missing Claimed versus verified emission reductions are not available in the extracted record, and the monitoring or usage monitoring method is not stated.
Claim Safety
verified The project uses a project baseline and the validation report shows no material findings, which supports some claim reliability.
missing Leakage treatment is weakly documented, and CORSIA eligibility and CCP status are not stated, leaving residual double-claim and over-crediting uncertainty.
Documentation
verified Two core documents are listed in evidence and the validation report is recent, dated 2024-08-07.
missing The extraction confidence is low, several key fields are not stated, and the record includes an unresolved contradiction on additionality.
Detailed Analysis
Integrity
The validation report dated 2024-08-07 confirms additionality through an investment test and says the VVB verified it, which is a meaningful positive. At the same time, leakage is not addressed in the validation report, buffer pool coverage is not found, and reversal information is not stated, so permanence and leakage robustness remain weakly evidenced. No material findings or corrective actions were reported, which helps, but the overall integrity score is held back by the missing treatment of key risk areas.
Transparency
The documentation identifies the VVB and provides the monitoring and crediting period, which supports basic traceability. However, the extracted record does not include claimed versus verified emission reductions, the monitoring method, or usage monitoring details, so MRV transparency is limited. The low extraction confidence further reduces confidence that the public record is complete.
Claim Safety
The project appears to use a project-specific baseline, and the validation report reports no material findings, which is supportive but not sufficient on its own. Leakage is a concern because the validation report says it is not addressed, even though another part of the record shows a zero deduction. CORSIA eligibility and CCP status are not stated, so the project cannot be treated as clearly insulated from double-claim risk.
Documentation
The evidence set includes the PDD and validation report, and the validation report is recent, which is a positive sign. But the extraction confidence is low, several important fields are not stated, and the record contains a contradiction on additionality between the PDD and the later validation report. That combination points to moderate documentation quality rather than strong completeness.
Overall
I privileged the later validation report over the earlier PDD where they conflict, because it is more recent and reflects the VVB-validated position; that means I treated additionality as confirmed by the VVB, while still penalizing the score for the contradiction. I also privileged the validation report’s statement that leakage is not addressed over the conflicting indication of a quantified treatment, because the later document is more authoritative in this record and the contradiction itself lowers reliability. The project is not weak enough to trigger the integrity gate, but the missing leakage, permanence, and MRV detail keep the overall assessment in the mid range.
Audit Analysis
This project has some strengths, including VVB-confirmed additionality, no reported material findings, and documented safeguards such as FPIC and a grievance mechanism. However, the record has important evidence gaps around leakage, permanence, and public MRV detail, and the extraction quality is low, which reduces confidence in the documentation.
Project Description
Proponent: Goodwatts WTE Jamnagar Private Limited Protocol categories: Energy industries (renewable/non-renewable sources); Waste handling and disposal Protocols: AMS-I.D.; AMS-III.E. Estimated annual GHG reductions: 46759 tCO2e Region: Asia Registration date: 2024-11-07
Red Flags
- Leakage is marked as not addressed in the validation report, despite a zero deduction being shown elsewhere in the record.
- The project has a contradiction on additionality between the PDD and the later validation report, and the extraction confidence is low.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Publish a clear leakage assessment and reconcile the zero deduction with the validation report’s statement that leakage is not addressed.
- Provide a complete MRV package with verified versus claimed issuance, monitoring methodology, and explicit reversal/buffer pool treatment.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal evidence, but buffer not stated
Leakage not addressed clearly
Project baseline, reassessment not stated
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →